Preliminary Design Review (PDR)(Interim Design Review Sample Clauses

Preliminary Design Review (PDR)(Interim Design Review. The goal of the Preliminary Design Review (PDR) is to review the design work to date to determine that the design effort is on track and that no major issues exist with the design simulation or design methodology, predicted performance, chip layout (floor plan), or product assembly and test. This review should address predicted performance of the circuit. Preliminary Design Reviews will include as applicable: i. Review final specifications ii. Schematic diagrams iii. Simulation results for key parameters iv. Thermal analysis v. Compliance Matrix: Simulated Performance vs.. Specification vi. Preliminary chip layout (floor plan) vii. Test approach viii. Design Review documentation package ix. Risk analysis and mitigation plan
AutoNDA by SimpleDocs

Related to Preliminary Design Review (PDR)(Interim Design Review

  • Design Review Consumer shall provide Holy Cross an electrical one-line diagram and a relaying and metering one-line diagram prior to completion of detailed designs, unless the Consumer is installing a packaged system that is pre-certified to IEEE 1547.1 and UL 1741 standards. Packaged systems pre-certified under IEEE Standard 1547.1 and UL Standard 1741 will not require a relaying and metering one-line diagram. The submitted application and diagrams will be processed, reviewed, and acted upon in accordance with the Holy Cross Interconnection Policy.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following:

  • Transition Review Period In accordance with Article 35, Layoff and Recall, the Employer may require an employee to complete a transition review period.

  • Project Review A. Programmatic Allowances

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Space Plan Tenant or Tenant’s Architect shall prepare a proposed space plan for the Tenant Improvements in the Premises which shall include a layout and designation of all partitioning, intended use for such space and equipment to be contained therein (the “Space Plan”) and shall deliver the proposed Space Plan to Landlord with a request for Landlord’s approval. Landlord shall approve or disapprove the Space Plan by written notice given to Tenant within ten (10) Business Days after receipt of the Space Plan. Landlord shall not unreasonably withhold its approval of the Space Plan, provided that, without limiting the generality of the foregoing, Landlord shall be entitled to withhold its consent to the Space Plan if, in Landlord’s good faith judgment, any one or more of the following conditions exist: (a) the proposed Tenant Improvements will adversely affect the exterior appearance of the Building; (b) the proposed Tenant Improvements may impair the structural strength of the Building, affect any of the Base Building Systems or adversely affect the value of the Building; or (c) the proposed Tenant Improvement Work would trigger the necessity under Applicable Laws or otherwise for work to be performed outside the Premises. If Tenant’s proposed interior partitioning or other aspects of the Tenant Improvement Work will, in Landlord’s good faith judgment, require changes or alterations in the Base Building Systems located outside of the Premises, and Landlord approves such changes or alterations, such changes or alterations shall be made at Tenant’s expense. If Landlord disapproves the Space Plan, Landlord shall return the Space Plan to Tenant with a statement of Landlord’s reasons for disapproval, or specifying any required corrections and/or revisions. Landlord shall approve or disapprove of any revisions to the Space Plan by written notice given to Tenant within five (5) Business Days after receipt of such revisions. This procedure shall be repeated until Landlord approves the Space Plan (as so approved, the “Approved Space Plan”).

  • REVIEW OF WORK The Consultant shall permit the City, its agents and/or employees to review, at any time, all work performed pursuant to the terms of this Agreement at any stage of the work;

  • Validation Review In the event OIG has reason to believe that: (a) Good Shepherd’s Claims Review fails to conform to the requirements of this CIA; or (b) the IRO’s findings or Claims Review results are inaccurate, OIG may, at its sole discretion, conduct its own review to determine whether the Claims Review complied with the requirements of the CIA and/or the findings or Claims Review results are inaccurate (Validation Review). Good Shepherd shall pay for the reasonable cost of any such review performed by OIG or any of its designated agents. Any Validation Review of Reports submitted as part of Good Shepherd’s final Annual Report shall be initiated no later than one year after Good Shepherd’s final submission (as described in Section II) is received by OIG. Prior to initiating a Validation Review, OIG shall notify Good Shepherd of its intent to do so and provide a written explanation of why OIG believes such a review is necessary. To resolve any concerns raised by OIG, Good Shepherd may request a meeting with OIG to: (a) discuss the results of any Claims Review submissions or findings; (b) present any additional information to clarify the results of the Claims Review or to correct the inaccuracy of the Claims Review; and/or (c) propose alternatives to the proposed Validation Review. Good Shepherd agrees to provide any additional information as may be requested by OIG under this Section III.D.3 in an expedited manner. OIG will attempt in good faith to resolve any Claims Review issues with Good Shepherd prior to conducting a Validation Review. However, the final determination as to whether or not to proceed with a Validation Review shall be made at the sole discretion of OIG.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.