Post‐Installation Work Verification and Quality Assurance Sample Clauses

Post‐Installation Work Verification and Quality Assurance. ● Participating Contractor shall allow Utilities or the Program Implementer to conduct random field inspections of work that has been performed; ● Participating Contractor understands that Utilities will inspect a minimum of 10% of all jobs performed by each contractor participating in the HPwES Program in this manner; ● Participating Contractor, upon request of Utilities or the Program Implementer, and at no additional cost to the customer, shall make reasonable repairs or corrections to work that Participating Contractor has performed to bring such work up to HPwES Program standards. This requirement survives the termination of this Agreement; ● Participating Contractors recently joining the HPwES Program may be subject to a higher inspection percentage. For example, the first five (5) jobs will be inspected. However, existing HPwES contractors in good standing with New Jersey’s Clean Energy Program will be grandfathered in. ● If any health and safety issue is found at the time of test-out, the Participating Contractor must submit documentation that the proper remediation of the health and safety issue has been completed in order for the customer rebate application to be considered complete; and ● Should any non-compliance issues be discovered as a result of these inspections, the Utility or Program Implementer will notify the Participating Contractor. Within thirty (30) days of the notification, and at no additional cost to the customer, the Participating Contractor shall make any required health and safety repairs or corrections, and/or reasonable repairs needed to bring such work up to HPwES Program standards. All serious health and safety non-compliance issues associated with the project must be rectified by the Participating Contractor immediately. Participating Contractors are subject to the Utilities’ Contractor Remediation Procedures which can be accessed here.
AutoNDA by SimpleDocs
Post‐Installation Work Verification and Quality Assurance. Participating Contractor shall allow Pepco or the Program Implementer to conduct random field inspections of work that has been performed; • Participating Contractor understands that Pepco will inspect a minimum of 5% of all jobs performed by each contractor participating in the Program in this manner; • Participating Contractor, upon request of Pepco or the Program Implementer, and at no additional cost to the customer, shall make reasonable repairs or corrections to work that Participating Contractor has performed to bring such work up to Program standards. This requirement survives the termination of this Agreement; • Participating Contractors recently joining the Program may be subject to a higher inspection percentage. For example, three (3) of the first five (5) jobs may be inspected; • If any health and safety issue is found at the time of test‐out, the Participating Contractor must submit documentation that the proper remediation of the health and safety issue has been completed in order for the customer rebate application to be considered complete; and • Should any non‐compliance issues be discovered as a result of these inspections, the Program Implementer will notify the Participating Contractor. Within thirty (30) days of the notification, and at no additional cost to the customer, the Participating Contractor shall make any required health and safety repairs or corrections, and/or reasonable repairs needed to bring such work up to Program standards. All serious health and safety non‐compliance issues associated with the project must be rectified by the Participating Contractorimmediately.

Related to Post‐Installation Work Verification and Quality Assurance

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Drug-Free Workplace Certification As required by Executive Order No. 90-5 dated April 12, 1990, issued by the Governor of Indiana, the Contractor hereby covenants and agrees to make a good faith effort to provide and maintain a drug-free workplace. The Contractor will give written notice to the State within ten (10) days after receiving actual notice that the Contractor, or an employee of the Contractor in the State of Indiana, has been convicted of a criminal drug violation occurring in the workplace. False certification or violation of this certification may result in sanctions including, but not limited to, suspension of contract payments, termination of this Contract and/or debarment of contracting opportunities with the State for up to three (3) years. In addition to the provisions of the above paragraph, if the total amount set forth in this Contract is in excess of $25,000.00, the Contractor certifies and agrees that it will provide a drug-free workplace by:

  • Quality Assurance Requirements There are no special Quality Assurance requirements under this Agreement.

  • Monitoring and Adjusting Forecasts Verizon will, for ninety (90) days, monitor traffic on each trunk group that it establishes at ECI’s suggestion or request pursuant to the procedures identified in Section 14.2 of this Attachment. At the end of such ninety-(90) day period, Verizon may disconnect trunks that, based on reasonable engineering criteria and capacity constraints, are not warranted by the actual traffic volume experienced. If, after such initial ninety (90) day period for a trunk group, Verizon determines that any trunks in the trunk group in excess of two (2) DS1s are not warranted by actual traffic volumes (considering engineering criteria for busy Centium Call Second (Hundred Call Second) and blocking percentages), then Verizon may hold ECI financially responsible for the excess facilities and disconnect such excess facilities.

  • Quality Assurance The parties endorse the underlying principles of the Company’s Quality Management System, which seeks to ensure that its services are provided in a manner which best conforms to the requirements of the contract with its customer. This requires the Company to establish and maintain, implement, train and continuously improve its procedures and processes, and the employees to follow the procedures, document their compliance and participate in the improvement process. In particular, this will require employees to regularly and reliably fill out documentation and checklists to signify that work has been carried out in accordance with the customer’s specific requirements. Where necessary, training will be provided in these activities.

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Quality Assurance Plan The contractor shall develop and submit to NMFS a contractor Quality Assurance Plan, as referenced in Section F.5.3, which details how the contractor will ensure effectiveness and efficiency of collection efforts as well as the quality of data collected by its At-Sea Monitors. The contractor shall further establish, implement, and maintain a Quality Assurance Management program to ensure consistent quality of all work products and services performed under this contract.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.