Horizontal Curves Sample Clauses

Horizontal Curves. A minimum sight distance with clear visibility, measured along the centerline, shall be provided of at least three hundred (300’) feet on major streets, two hundred (200’) feet for collector (and industrial) streets and one hundred (100’) feet on all other streets.
AutoNDA by SimpleDocs
Horizontal Curves. A. The minimum radius of all curves on Mainline Track shall accommodate all On-track Vehicles.
Horizontal Curves. A design exception is required if ∆V exceeds 15 mph and there is an accident cluster or trend associated with the design element. Clear Zone: Consider the removal, relocation or shielding of obstacles within the clear zone. The decision to address these issues will depend on the degree of severity of the problem, accident clusters or trends identified by Safety Management cost effectiveness of treatment, the scope and time constraints of the project and available funding. Decisions to not provide an adequate clear zone must be documented in the Scope of Work Report and supported by an approved design exception. Signing: Signing upgrades are mandatory for all rehabilitation projects. Drainage: Drainage issues, such as severe pipe corrosion or erosion that could adversely impact the roadway, that are identified during the preliminary field review or by MDT Maintenance will be considered for treatment. The decision to address these issues will depend on the degree of severity of the problem, cost effectiveness of treatment, the scope and time constraints of the project and available funding. Major Rehabilitation Intent: The intent of these projects is to rehabilitate the existing pavement structure through an engineered approach that considers the observed pavement distress, the in-place material, and roadway geometrics. Milling operations may be > 0.20 ft (60 mm) and may expose base gravel which can then be treated or modified. New right-of-way and utility relocation may be required to improve geometrics, to flatten slopes and enhance safety. Considerations: Eligible Funding: Major Rehabilitation projects will be funded with Federal Aid funds. Environmental Process: Follow the NEPA process. Development time: Appropriate soil survey work, subsurface analysis, traffic data and accident data must be collected. The preliminary surfacing recommendation a 20-year design life will confirm the level of rehabilitation (minor or major). The data collection and engineering required to determine the level of rehabilitation should take six to nine months. Additional development time for a major rehabilitation should be three to four years, given the probable inclusion of other features. Americans With Disabilities Act: Install curb ramps wherever curb, gutter and sidewalk are adjacent to the project. Evaluate existing and potential pedestrian use to determine ramp locations, the need for sidewalk improvements, and the installation of additional sidewalk. Coordinate propo...

Related to Horizontal Curves

  • Elevation Elevation is defined as restoring an employee to the higher classification, with permanent status, which was held prior to being granted a demotion or to a class that is between the current class and the class from which the employee was demoted. Upon elevation, an employee’s salary will be determined in the same manner that is provided for promotion in Section 43.5, above.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where EveryCall has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to EveryCall. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for EveryCall (e.g. hairpinning):

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Teaching Load Full teaching assignments shall normally include 12 course credit hours of scheduled teaching per academic quarter. A reassignment of duty, for the equivalent of 3 or 4 credit course, shall be provided during one term of the first academic year to all newly hired tenure track faculty to further their teaching, scholarship and service and to encourage faculty retention. Wherever possible the University will endeavor to arrange teaching schedules that avoid excessive numbers of preparations and recognize evening and/or off-campus assignments. Class sizes will be established and monitored by the appropriate academic xxxx in consultation with division chairs and affected faculty each term. The following equivalencies will be used in determining teaching assignments:

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

  • Bidder Supplied Samples The Commissioner reserves the right to request from the Bidder/Contractor a representative sample(s) of the Product offered at any time prior to or after award of a contract. Unless otherwise instructed, samples shall be furnished within the time specified in the request. Untimely submission of a sample may constitute grounds for rejection of Bid or cancellation of the Contract. Samples must be submitted free of charge and be accompanied by the Bidder’s name and address, any descriptive literature relating to the Product and a statement indicating how and where the sample is to be returned. Where applicable, samples must be properly labeled with the appropriate Bid or Contract reference. A sample may be held by the Commissioner during the entire term of the Contract and for a reasonable period thereafter for comparison with deliveries. At the conclusion of the holding period the sample, where feasible, will be returned as instructed by the Bidder, at the Bidder’s expense and risk. Where the Bidder has failed to fully instruct the Commissioner as to the return of the sample (i.e., mode and place of return, etc.) or refuses to bear the cost of its return, the sample shall become the sole property of the receiving entity at the conclusion of the holding period.

  • CLEC OUTAGE For a problem limited to one CLEC (or a building with multiple CLECs), BellSouth has several options available for restoring service quickly. For those CLECs that have agreements with other CLECs, BellSouth can immediately start directing traffic to a provisional CLEC for completion. This alternative is dependent upon BellSouth having concurrence from the affected CLECs. Whether or not the affected CLECs have requested a traffic transfer to another CLEC will not impact BellSouth's resolve to re-establish traffic to the original destination as quickly as possible.

  • Ceiling Company and its subcontractors will not affix, attach, or suspend any lighting fixtures, signs, or other fixtures or devices of any kind or nature from the ceiling above any of the Premises without the prior written approval of Authority.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

Time is Money Join Law Insider Premium to draft better contracts faster.