Development Time Sample Clauses

The "Development Time" clause defines the period allocated for completing development work under an agreement. It typically specifies the start and end dates for the development phase, outlines any milestones or deadlines, and may address what happens if delays occur. By clearly establishing the timeframe for deliverables, this clause helps manage expectations, ensures timely project completion, and provides a basis for addressing delays or extensions.
Development Time. First version of development cycle is 2008/01/02-2008/10/30
Development Time. USSI will provide Customer with [*] StaffWeeks of CSM development (exclusive of travel, lodging, subsistence and communication expenses) for the charge of [*]. Travel, lodging, and subsistence expenses for USSI personnel performing any services away from USSI's ▇▇▇▇▇▇ Lake facility, as well as communication expenses (including but not limited to, telephone, telefax, courier, express mail and dial-up data transmissions), are additional and are the responsibility of Distributor. [*] Confidential treatment has been requested with respect to the information contained within the "[*]" markings. Such marked portions have been omitted from this filing and have been filed separately with the Securities and Exchange Commission.
Development Time. Appropriate soil survey work, subsurface analysis, traffic data and accident data must be collected. The preliminary surfacing recommendation using a minimum design life of 10 years will confirm the level of rehabilitation (minor or major). The data collection and engineering required to determine the level of rehabilitation should take six to nine months. Additional development time for a minor rehabilitation should be one and one half to two years, given the possible inclusion of other features. Install curb ramps wherever curb, gutter and sidewalk are adjacent to the project. Evaluate existing and potential pedestrian use to determine ramp locations, the need for sidewalk improvements, and the installation of additional sidewalk. Coordinate proposed improvements and any necessary exceptions with the ADA coordinator. STP (Primary) - If the existing width exceeds the width described in the “Design Guidelines” memo dated August 5, 2008 (note that these widths are different that the AASHTO roadway widths for collectors), reduce the top width to accommodate the overlay. If the resulting width will be less than the “Design Guidelines” width, steepen surfacing inslopes to no steeper than 4:1 before reducing the width. If the overlay cannot be accommodated by steepening the surfacing inslopes reduce the width to a minimum of 28 ft for ADT > 300, or a minimum of 24 ft. for ADT < 300. If the placement of the overlay will result in a top width less than 28 ft., employ the Roadway Width Decision Process to determine if a lesser width can be utilized. Widths less than 24 ft are not acceptable. Consider pavement management analysis when selecting minor rehabilitation projects. If the proposed rehabilitation strategy is the same, or one category above or below what is recommended by the Pavement Management System (PvMS) in their annual treatment and condition reports, no further review is needed. However, an in-depth review and justification is needed if the proposed project treatment moves the treatment from rehabilitation to preventative maintenance.
Development Time. An overview per year will be provided, showing: • Average development time for IEC standard • Average development time for EN IEC standard • Average development time for hEN IEC standard • Average development time for CENELEC homegrown EN • Average development time for CENELEC homegrown hEN • identification of number of late projects (CD - CDV - FDIS stages) 8 Annexes‌ Annex 1 Boomerang procedure‌ See attached document BT(SG)3996 of June 2000. REFINED APPROACH TO THE BOOMERANG PROCEDURE Follow up of D103/151 The comments and suggestions brought forward by CS on the practical implementation of the boomerang procedure (as defined in D102/159) had triggered the decision at 103 BT to reconvene the ad hoc WG for preparing a refined approach to the procedure based upon the comments received (ref. D103/151). The ad hoc WG “Boomerang” met on 5 June 2000 in Prague, under the convenorship of Dr R. Salffner (attendance list in Annex 1). As a first step the WG concentrated on the major proposed change, i.e. the simplification of the procedure by excluding all boomerang standards from parallel procedures. With this option there would be one and only one procedural way until IEC has finished its work and BT can make subsequently individual decisions on the implementation in Europe of boomerang IEC standards, on the basis of the advice from the relevant CLC/TC or SR. The WG agreed with this principle and resolved to recommend to BT the approval of the refined approach to the boomerang procedure as laid down in Annex 2. The discussion of the other comments and suggestions of CS led to the following guidelines in the context of the boomerang procedure : ∗ in case of coexistence of an EN 5XXXX and an identical (boomerang) EN 6XXXX, the latter should by preference be referenced. Emphasis should be put on this fact by stressing that this case merely reflects a renumbering action (see also Annex 3 and Annex 4); ∗ in this same case no dow shall be fixed for the adopted boomerang EN 6XXXX. It remains however the prerogative of BT to fix a dow where appropriate, on a case by case basis; ∗ once a boomerang standard has ended its journey, only that EN 6XXXX can be amended or revised.
Development Time. 115 STAFFWEEK(S) ----------------
Development Time. This is a research program and unexpected challenges can arise at any time. ISE will notify Encore of any such challenges and potential resultant delays as early as possible. ISE understands the time sensitivity of the program and will make all reasonable attempts to minimize the development time of each Milestone. It is estimated that Phase A will take 6-9 months and that Phase B ▇▇▇▇ ▇ake 9-12 months.
Development Time. The period beginning with the execution of this agreement and ending with the delivery for acceptance testing of the first filter prototype to OPLINK.

Related to Development Time

  • Development Plans Customer has provided Provider with a report attached hereto as Exhibit D (the “Current Development Plan”) describing in detail, as of January 1, 2017, the planned development, drilling, production, processing, treating, marketing and other activities to take place with respect to Dedicated Production and Customer Injected NGLs for the applicable Development Period. The information contained in the Current Development Plan is, with respect to the first three Years covered by the Current Development Plan, on a Quarter-by-Quarter basis, and with respect to the remaining Years covered by the Current Development Plan, on a Year-by-Year basis. The Current Development Plan attached hereto has been approved by the Parties. (a) From time to time during each Year of the Term, the Parties shall meet to discuss the planned development, drilling, production, processing, treating, marketing and other activities that Customer expects to take place with respect to Dedicated Production and Customer Injected NGLs for the then-applicable Development Period. Customer and Provider shall each make their respective representatives available to participate in such meetings and discussions. No later than August 1 of each such Year, Customer shall provide (or cause to be provided) to Provider a proposed update of the then-currently agreed Development Plan, prepared on the same basis as the Current Development Plan and describing in detail the planned development, drilling, production, processing, treating, marketing and other activities to take place with respect to Dedicated Production and Customer Injected NGLs for the then-applicable Development Period (any such update, an “Updated Development Plan” and, together with the Current Development Plan, each, a “Development Plan”). (b) Each proposed Development Plan shall include information as to the following, in each case, broken out, with respect to the first three Years covered by such Development Plan, on a Quarter-by-Quarter basis, and, with respect to the remaining Years covered by such Development Plan, on a Year-by-Year basis: (i) forward-looking production estimates for the applicable time period covered by such Development Plan for all Customer Gas and Customer Injected NGLs (A) that Customer reasonably and in good faith believes will become owned or Controlled by Customer during the time period covered by such Development Plan, and/or (B) that will be produced from (I) in the aggregate, all ▇▇▇▇▇ then-existing and (II) in the aggregate, all ▇▇▇▇▇ that are expected to be drilled during the time period covered by such Development Plan (each such Well reflected in such Development Plan, a “Planned Well” and, such collective estimates described in subsections (A) and (B), both with respect to a particular Quarter and an entire Year, the “Dedicated Production Estimates”); TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). (ii) (A) each new receipt point (including the location thereof) proposed by Customer with respect to the Dedicated Production Estimate reflected in such Development Plan (each such receipt point, a “Planned Receipt Point”), (B) each Receipt Point at which Customer expects to Tender Customer Gas or Customer Injected NGLs reflected in such Development Plan into the TGP System, and (C) the estimated portion of the Dedicated Production Estimate contained in such Development Plan that Customer expects to Tender at each such Receipt Point and Planned Receipt Point; (iii) (A) each new delivery point (including the location thereof) proposed by Customer with respect to the Dedication Production Estimate reflected in such Development Plan (each such delivery point, a “Planned Delivery Point”), (B) each Delivery Point at which Customer expects to Nominate Customer Residue Gas or Customer NGLs produced from the Dedicated Production Estimate reflected in such Development Plan to be redelivered to Customer, and (C) the estimated volumes of Customer Residue Gas and Customer NGLs produced from the Dedication Production Estimate contained in such Development Plan that Customer expects to Nominate to each such Delivery Point; (iv) the earliest date on which each Planned Receipt Point and Planned Delivery Point included in the Development Plan is required by Customer to be placed into service, which date shall not be earlier than three Months after the January 1st that is immediately subsequent to the date that the Development Plan that initially reflected such Planned Receipt Point or Planned Delivery Point was delivered to Provider hereunder; (v) the anticipated characteristics of the production from the ▇▇▇▇▇ and Planned ▇▇▇▇▇ reflected in such Development Plan (including liquids content and gas and liquids composition) and the projected production volumes and production pressures applicable thereto; provided that Customer may utilize the existing and historical production information from similarly situated ▇▇▇▇▇; (vi) any (A) proposed revision to the then-existing Dedicated Area and/or any then-existing Dedicated Contract and/or (B) any new contract that Customer proposes to be a Dedicated Contract; and (vii) other information reasonably requested by Provider that is relevant to the design, construction, and operation of the TGP System, including (A) any applicable Plant Expansion or Facilities Modification proposed by Customer, (B) the relevant Receipt Point and Planned Receipt Point facilities applicable to such Development Plan, and (C) the relevant Delivery Point and Planned Delivery Point facilities applicable to such Development Plan. TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**).

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones) B. Estimated total development time

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in ▇▇▇▇▇, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Development Period The Contractor may commence pre-construction activities like utility shifting, boundary wall construction or any other activity assigned to the Contractor by the Authority to enable construction of the Project Highway immediately after signing of the Agreement, to the extent that such work is ready for execution. The Parties agree that these works may be taken up and completed to the extent feasible by the Contractor, before declaration of the Appointed Date, but no claim against the Authority for delay shall survive during this period and that the undertaking of these works by the Contractor shall not count towards the Scheduled Construction Period of the project which starts counting only from the Appointed Date. No construction activity of the Project Highway shall be undertaken during the development period.