Highway Sample Clauses

Highway. Highway, streets, bridges, airports, and grading, drainage and waterlines work let in connection with highways, streets, bridge, and airport projects within the project limit.
Highway. The Right-of-Way and all the facilities which have been or may be constructed therein for the use and benefit of the traveling public.
Highway. Highway means a common and public highway, any part of which is intended for or used by the general public for the passage of vehicles and includes the area between the lateral property lines thereof.
Highway. The replacement vehicle must not be in a larger weight class than the existing vehicle (Class 5, 6, 7, or 8). Exceptions may be granted for vocational purposes and will require written approval by the EPA Project Officer prior to purchase.
Highway. Primary duties for the Highway Department shall include but are not limited to trash removal, pot hole repair, deer removal, storm response and brush removal. No one may grieve the
Highway. The entire Right of Way reserved for use in constructing or maintaining the roadway and its appurtenances. Historical Flood Level. The highest flood level that is known to have occurred at a given location. Holidays. The days specifically set forth in Section 108.02 or in the Contract Documents. Hydrologic Data Sheet. A tabulation of hydrologic data for facilities conveying a 100-year discharge equal to or greater than 500 cubic feet per second.
Highway. 6-lane Highway that will connect the Intermodal Transportation Terminal (ITT) in San Xxxx Del Xxxxx, Bulacan to Bocaue/Balagtas Interchange North Luzon Expressway (NLEX). MRT 7 – ROAD ACCESS INTERMODAL TRANSPORTATION TERMINAL • Located adjacent to Depot which can accommodate 60 buses at any given time, complete with facilities, i.e., passenger waiting areas, lounges, ticket booths, etc. • With facilities standard to an intermodal terminal INTERMODAL TRANSPORTATION TERMINAL (ITT) MRT7 ALIGNMENT STATION TO STATION DISTANCE (m) North Avenue - QMC 2,195 QMC - University Avenue 000 Xxxxxxxxxx Xxxxxx - Tandang Sora 1,664 Tandang Sora - Don Antonio 2,356 Don Antonio – Batasan 973 Batasan - Manggahan 1391 Manggahan - Xxxx Xxxxxx 1,470 Xxxx Xxxxxx - Xxxxxxxx 1,145 Xxxxxxxx - Mindanao 3,430 Mindanao - Quirino 787 Quirino - Sacred Heart 1,855 Sacred Heart - Tala 2,025 Tala - San Xxxx Del Xxxxx 2,543 TOTAL 22,623 PROJECT STATUS Particulars Physical Accomplishment Remarks/Status