for Mooring Sample Clauses

for Mooring. The Design Basis for the Mooring is described below. The Mooring will be located at the coordinates set out in Schedule 1 Part C as at the date hereof (the “Site”). It is assumed that there are no explosives, wrecks or other elements within the area available that are preventing or delaying installation of the Mooring. The water depth for the Site is approximately 24m LAT (Lowest Astronomical Tide). The Mooring selected by Company to keep the FSRU permanently moored at the Site is of a Tower Yoke Mooring System type designed to withstand the extreme met-ocean values as recommended by the Classification Society. For the Design Basis of the Tower Yoke Mooring System reference is made to Schedule 17. The Mooring System is not designed against tsunami conditions as per the Design Basis.
AutoNDA by SimpleDocs

Related to for Mooring

  • FLOORING Grade and quality of carpeting to be selected by Landlord, with color to be selected by Tenant from those offered by Landlord.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Cockpit (a) Fairing panels shall be free of stains and cracks, will be clean secure and repainted as necessary;

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation license to enter the Premises for the purpose of performing such work as said person shall deem reasonably necessary to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord (except in the case of Landlord Parties’ willful misconduct or gross negligence) and without reducing or otherwise affecting Tenant’s obligations under this Lease. Any such work must be conducted in a manner that minimizes disruption and inconvenience to Tenant.

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

  • Lighting Landlord will furnish both Building Standard and non-Building Standard lamps, bulbs, ballasts and starters that are part of the Leasehold Improvements for purchase by Tenant at Landlord's cost, plus Landlord's standard administration fee. Landlord will install non-Building Standard items at Landlord's scheduled rate for this service.

  • Landscaping Maintaining, tending and cultivating and (as necessary) re-stocking any garden or grassed areas including replacing plants, shrubs and trees as necessary.

  • Electrical During the Term of this Lease, there shall be available to the Leased Premises electrical facilities comparable to those supplied in other comparable office buildings in the vicinity of the Building to provide sufficient power for normal lighting and office machines of similar low electrical consumption, and one personal computer for each desk station, but not for any additional computers or extraordinary data processing equipment, special lighting and any other item of electrical equipment which requires a voltage other than one hundred ten (110) volts single phase and is not typically found in an office, as determined by Landlord in its sole, but reasonable discretion; and provided, however, that if the installation of such electrical equipment requires additional air conditioning capacity above that normally provided to tenants of the Building or above standard usage of existing capacity as determined by Landlord in its sole, but reasonable discretion, then the additional air conditioning installation and/or operating costs attributable thereto shall be paid by Tenant. Tenant agrees not to use any apparatus or device in, upon or about the Leased Premises which may in any way increase the amount of such electricity usually furnished or supplied to the Leased Premises, and Tenant further agrees not to connect any apparatus or device to the wires, conduits or pipes or other means by which such electricity is supplied, for the purpose of using additional or unusual amounts of electricity, without the prior written consent of Landlord. At all times, Tenant’s use of electric current shall never exceed Tenant’s share of the capacity of the feeders to the Building or the risers or wiring installation. Tenant shall not install or use or permit the installation or use in the Leased Premises of any computer or electronic data processing or ancillary equipment or any other electrical apparatus designed to operate on electrical current in excess of 110 volts and 5 amps per machine, without the prior written consent of Landlord, which consent shall not be unreasonably withheld, conditioned or delayed. If Tenant shall require electrical current in excess of that usually furnished or supplied for use of the Leased Premises as general office space, Tenant shall first procure the written consent of Landlord (which consent shall not be unreasonably withheld, conditioned or delayed) to the use thereof and Landlord or Tenant may (i) cause a meter to be installed in or for the Leased Premises, or (ii) if Tenant elects not to install said meter, Landlord may reasonably estimate such excess electrical current. The cost of any meters (including, without limitation, the cost of any installation) or surveys to estimate such excess electrical current shall be paid by Tenant. Landlord’s approval of any space plan, floor plan, construction plans, specifications, or other drawings or materials regarding the construction of the Tenant Improvements or any alterations shall not be deemed or construed as consent by Landlord under this paragraph to Tenant’s use of such excess electrical current as provided above. Tenant agrees to pay to Landlord, promptly upon demand therefor, all costs of such excess electrical current consumed as calculated by said meters (at the rates charged for such services to the Building by the municipality or the local public utility) or the excess amount specified in said estimate, as the case may be, plus any additional expense incurred in keeping account of the electrical current so consumed, which additional expense Landlord shall advise Tenant within a reasonable time after request by Tenant.

Time is Money Join Law Insider Premium to draft better contracts faster.