Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:
FINISHES Buyer(s) understands that the location of telephone, electric, cable TV and other utility outlets, doors, windows, air conditioning components, lighting fixtures, equipment and fixtures are subject to change and Buyer(s) understands that materials such as brick, wood, wood grain, carpeting, paint, cabinets, cultured marble, tile, Formica, granite and the like are subject to shading and gradation and may vary from samples, models or color charts, and from piece to piece, and Contractor shall not be liable for such variations.
Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.
Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;
Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;
Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.
Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.
Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:
Work Area The specific work area and/or crew an employee reports to on a daily schedule. Work areas are generally smaller divisions of a larger Bid Area.
Porcupine Site Highway 11