EXPECTED UNIT CONSUMPTION OF RAW MATERIALS AND UTILITIES Sample Clauses

EXPECTED UNIT CONSUMPTION OF RAW MATERIALS AND UTILITIES. Nitric Acid Plant (Revise for new Air Compressor and ammonia vaporizer system) When the plant is operated in accordance with the procedures recommended by Xxxxxxxxx Inc., Xxxxxxxxx expects that the plant will consume the following quantities of raw materials and utilities per short (2,000 pound) ton of nitric acid (100% basis) produced at the 1100 STPD rate. Amount Per Short Ton Acid (100% Basis) 1100 STPD Ammonia (100% basis) s. ton including NOx abatement requirement 0.2875 Gross Platinum Catalyst Xxxx xx. 0.0080 Net Platinum Catalyst Xxxx oz. (Note 1) 0.0024 600 psig/750 °F Steam Export s. ton <0.814> 50 psig Steam Import s. ton 0.073 Steam Condensate Export s. ton <0.073> Boiler Feedwater s. ton (Note 2) 1.032 Cooling Water Mgals (Note 3) 25.0 Electric Power – 480v KWh (Note 4) 7.2 Turbine Condensate Export s.ton 0.013 NOTES:
AutoNDA by SimpleDocs

Related to EXPECTED UNIT CONSUMPTION OF RAW MATERIALS AND UTILITIES

  • Services and Utilities Provided that Tenant is not in default hereunder, Landlord agrees to furnish to the Premises during reasonable hours of generally recognized business days, to be determined by Landlord at his sole discretion, and subject to the rules and regulations of the Building of which the Premises are a part, electricity for normal lighting and fractional horsepower office machines, heat and air conditioning required in Landlord’s judgment for the comfortable use and occupation of the Premises, and janitorial service. Landlord shall also maintain and keep lighted the common stairs, common entries and toilet rooms in the Building of which the Premises are a part. Landlord shall not be liable for, and Tenant shall not be entitled to, any reduction of rental by reason of Landlord’s failure to furnish any of the foregoing when such failure is caused by accident, breakage, repairs, strikes, lockouts or other labor disturbances or labor disputes of any character, or by any other cause, similar or dissimilar, beyond the reasonable control of Landlord. Landlord shall not be liable under any circumstances for a loss of or injury to property, however occurring, through or in connection with or related to failure to furnish any of the foregoing. Wherever heat generating machines or equipment are used in the Premises which affect the temperature otherwise maintained by the air conditioning system, Landlord reserves the right to install supplementary air conditioning units in the Premises and the cost thereof, including the cost of installation, and the cost of operation and maintenance thereof shall be paid by Tenant to Landlord upon demand by Landlord. Tenant will not, without written consent of Landlord, use any apparatus or device in the Premises, including, but without limitation thereto, electronic data processing machines, punch card machines, and machines using in excess of 120 volts, which will in any way increase the amount of electricity usually furnished or supplied for the use of the Premises as general office space; nor connect with electric current except through existing electrical outlets in the Premises, any apparatus or device, for the purpose of using electric current. If Tenant shall require water or electric current in excess of that usually furnished or supplied for the use of the Premises as general office space, Tenant shall first procure the written consent of Landlord, which Landlord may refuse, to the use thereof and Landlord may cause a water meter or electrical current meter to be installed in the Premises, so as to measure the amount of water and electric current consumed for any such use. The cost of any such meters and of installation, maintenance and repair thereof shall be paid for by the Tenant and Tenant agrees to pay to Landlord promptly upon demand therefor by Landlord for all such water and electric current consumed as shown by said meters, at the rates charged for such services by the local public utility furnishing the same, plus any additional expense incurred in keeping account of the water and electric current so consumed. If a separate meter is not installed, such excess cost for such water and electric current will be established by an estimate made by a utility company or electrical engineer.

  • Preventive Maintenance The Contractor shall provide necessary preventive maintenance, required testing and inspection, calibration and/or other work necessary to maintain the equipment in complete operational condition during the warranty period.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Packaging Materials and Containers for Retail Sale Packaging materials and containers in which a good is packaged for retail sale shall, if classified with the good, be disregarded in determining whether all the non-originating materials used in the production of the good undergo the applicable change in tariff classification set out in Annex 4, and, if the good is subject to a regional value-content requirement, the value of such packaging materials and containers shall be taken into account as originating or non-originating materials, as the case may be, in calculating the regional value content of the good.

  • Materials and Methods 86 2.1 PARTICIPANTS 87 We used baseline measurements from a convenience sample of participants in previous (3) and 88 ongoing cohort studies investigating the effects of rehabilitation on balance responses (Table 1). PD 89 participants were mild-moderate with bilateral symptoms (Xxxxx and Xxxx stage 2-3 (13)). All 90 participants provided written informed consent and all study procedures were approved by Institutional 91 Review Boards at the Georgia Institute of Technology and Emory University.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • Utilities The Landlord shall provide the following utilities and services to the Tenant: _ _. Any other utilities or services not mentioned will be the responsibility of the Tenant.

  • COMMON UTILITIES Expenses for serving/supply of common facilities and utilities and all charges incidental thereto.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.

  • Utility Services Company agrees to pay the full cost and expense associated with its use of all utilities, including but not limited to water, sanitary sewer, electric, storm drainage, and telecommunication services.

Time is Money Join Law Insider Premium to draft better contracts faster.