ELECTRICAL DATA ANALYSIS Sample Clauses

ELECTRICAL DATA ANALYSIS. From the data set, five key parameters were defined: Minutes Plugged In, Minutes Operational, Energy Usage–Plugged In, Energy Usage–Operational, Average Power–Plugged In, and Average Power– Operational. Minutes Plugged In refers to the amount of time that an eTRU spent connected to the power system. This amount of time must exceed fifteen minutes for the eTRU to be considered connected. Minutes Operational is defined as the amount of time that an eTRU was plugged in and electrical draw exceeded the energy required to power the data collection system. Energy Usage–Plugged In refers to the total amount of electrical energy consumed while an eTRU was connected. Energy Usage–Operational is defined as the total amount of energy used while an eTRU was connected to the electrical facility and power consumption exceeded the power required for the data collection system. Average Power–Plugged In refers to the average power used while an eTRU was connected to the electrical facility. Average Power–Operational is defined as the average power used while the eTRU was plugged in and the system recorded energy usage above the system data collection system requirements. Using an approach similar to the diesel fuel consumption assessment, the affects of environmental exposure on the electrical power draw was investigated. This assessment reviewed the amount of power consumed while an eTRU was connected to the electrical facility and compared it to several measures of ambient temperature. By plotting this power consumption as a function of temperature, any correlation or trend between the two parameters can be observed graphically. Like with the fuel consumption assessment, other environmental factors may contribute to a change in power consumption for an eTRU; however, these again are difficult to consistently quantify. Therefore, it is again assumed that ambient temperature is an adequate indicator of the environmental exposure and can be used to identify these impacts on the power requirements of an eTRU. The approach taken to plot these data is identical to the approach used for the diesel fuel consumption analysis. Several conclusions may be drawn from the electrical usage data that were gathered. First, a higher ambient temperature correlates to an increased use in energy (Figure 4-5). Comparisons between the number of cooling degree days in a month and the average power consumption (Figure 4-5) as well as between the number of heating degree days in the month and the...
AutoNDA by SimpleDocs

Related to ELECTRICAL DATA ANALYSIS

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • ELECTRONIC WORKFLOW SYSTEM OGS reserves the right to incorporate an electronic workflow system that may include elements of the Authorized User RFQ process. OGS reserves the right to post Authorized User Contract usage of Centralized Contracts. TRAVEL, MEALS AND LODGING - LOT 4 – IMPLEMENTATION ONLY For Lot 4 only, when provided for in the RFQ and resultant Authorized User Agreement, the Authorized Users may reimburse travel expenses. All rules and regulations associated with this travel can be found at xxxx://xxx.xxxxx.xx.xx/agencies/travel/travel.htm. In no case will any travel reimbursement be charged that exceeds these rates. All travel will be paid only as specified within the Authorized User Agreement and must be billed with the associated services on the same Invoice with receipts attached. The Contractor shall receive prior approval from the Authorized User for any travel that occurs during the term of an Authorized User Agreement. Parking fees and/or parking tickets shall not be paid by an Authorized User. Unless otherwise specified in writing by the Authorized User, a vehicle will not be provided by Authorized User to the Contractor for travel. Therefore, the Contractor will be responsible for ensuring that the Contractor has access to an appropriate vehicle (e.g., personal vehicle or rental vehicle) or common carrier with which to carry out any necessary travel. For the Contractor to obtain reimbursement for the use of a rental vehicle, such use must be justified as the most cost- effective mode of transportation under the circumstances (including consideration of the most effective use of time). The Contractor is responsible for keeping adequate records to substantiate any claims for travel reimbursement. All services provided under the resultant Authorized User Agreement must be performed within CONUS. PERFORMANCE AND BID BONDS There are no BONDS for this Contract. However, an Authorized User may require in an RFQ a performance, payment or Bid bond, or negotiable irrevocable letter of credit or other form of security for the faithful performance for the resultant Authorized User Agreement. CONTRACTOR REQUIREMENTS AND PROCEDURES FOR PARTICIPATION BY NEW YORK STATE CERTIFIED MINORITY- AND WOMEN-OWNED BUSINESS ENTERPRISES AND EQUAL EMPLOYMENT OPPORTUNITIES FOR MINORITY GROUP MEMBERS AND WOMEN I. New York State Law Pursuant to New York State Executive Law Article 15-A and Parts 140-145 of Title 5 of the New York Codes, Rules and Regulations (“NYCRR”), the New York State Office of General Services (“OGS”) is required to promote opportunities for the maximum feasible participation of New York State-certified Minority- and Women-owned Business Enterprises (“MWBEs”) and the employment of minority group members and women in the performance of OGS contracts.

  • SERVICE MONITORING, ANALYSES AND ORACLE SOFTWARE 11.1 We continuously monitor the Services to facilitate Oracle’s operation of the Services; to help resolve Your service requests; to detect and address threats to the functionality, security, integrity, and availability of the Services as well as any content, data, or applications in the Services; and to detect and address illegal acts or violations of the Acceptable Use Policy. Oracle monitoring tools do not collect or store any of Your Content residing in the Services, except as needed for such purposes. Oracle does not monitor, and does not address issues with, non-Oracle software provided by You or any of Your Users that is stored in, or run on or through, the Services. Information collected by Oracle monitoring tools (excluding Your Content) may also be used to assist in managing Oracle’s product and service portfolio, to help Oracle address deficiencies in its product and service offerings, and for license management purposes.

  • Disturbance Analysis Data Exchange The Parties will cooperate with one another and the NYISO in the analysis of disturbances to either the Large Generating Facility or the New York State Transmission System by gathering and providing access to any information relating to any disturbance, including information from disturbance recording equipment, protective relay targets, breaker operations and sequence of events records, and any disturbance information required by Good Utility Practice.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Network Interface Device (NID) 2.7.1 The NID is defined as any means of interconnection of end-user customer premises wiring to BellSouth’s distribution plant, such as a cross-connect device used for that purpose. The NID is a single-line termination device or that portion of a multiple-line termination device required to terminate a single line or circuit at the premises. The NID features two independent xxxxxxxx or divisions that separate the service provider’s network from the end user’s customer-premises wiring. Each chamber or division contains the appropriate connection points or posts to which the service provider and the end user each make their connections. The NID provides a protective ground connection and is capable of terminating cables such as twisted pair cable.

  • Technology Research Analyst Job# 1810 General Characteristics Maintains a strong understanding of the enterprise’s IT systems and architectures. Assists in the analysis of the requirements for the enterprise and applying emerging technologies to support long-term business objectives. Responsible for researching, collecting, and disseminating information on emerging technologies and key learnings throughout the enterprise. Researches and recommends changes to foundation architecture. Supports research projects to identify and evaluate emerging technologies. Interfaces with users and staff to evaluate possible implementation of the new technology in the enterprise, consistent with the goal of improving existing systems and technologies and in meeting the needs of the business. Analyzes and researches process of deployment and assists in this process.

Time is Money Join Law Insider Premium to draft better contracts faster.