Dynamometer Sample Clauses

Dynamometer. 4.4.1. When using a load cell, the torque signal shall be transferred to the engine axis and the inertia of the dyno shall be considered. The actual engine torque is the torque read on the load cell plus the moment of inertia of the brake multiplied by the angular acceleration. The control system has to perform this calculation in real time.
AutoNDA by SimpleDocs
Dynamometer. The Dynamometer to be delivered to Korean DPA ----------- pursuant to the Korean Contract shall have been received by the Korean DPA in the Republic of Korea and the full amount of the purchase price payable thereunder by the Korean DPA shall have been paid by the Korean DPA to the Company.
Dynamometer. The stop watch method is satisfactory for short spans only. The target method is the most accurate method used on a wide range of spans. The dynamometer method is acceptable if used on all sag sections. Sag checks must be made for each 1 -1/4 miles (2kms) of line section to assure proper sags and tensions between deadend towers. The correct sag and tension is dependent on a number of factors including span length and temperature. Sag tables are available from FOCAS for this purpose. When the SkyLite(TM) is to be tensioned for sagging and deadending, a pocketbook type (come-along) grip is to be used for clamping on the cable. This grip must have a groove diameter honed to match the exact outer diameter of the SkyLite(TM) cable. The only substitute for this would be an OPGW deadend. SkyLite(TM) should be clipped in and grounds installed within 24 hours of sagging and deadending. In an emergency this may be extended to 48 hours if during the first 24 hours, grounds are installed to dissipate a lightning strike. Aeolian vibration can cause damage to unclipped and undampered SkyLite(TM) if it is left for extended periods of time in stringing sheaves. Vibration can be at its highest at initial installation tensions. Always be familiar and observe all of your company's safety rules when working with overhead electric lines. These installation recommendations should not supersede any safety practices.

Related to Dynamometer

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Speed The relative importance we attach is “high”.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Interfaces Bellcore’s GR-446-CORE defines the interface between the administration system and LIDB including specific message formats. (Bellcore’s TR-NWP-000029, Section 10)

  • Compatibility 1. Any unresolved issue arising from a mutual agreement procedure case otherwise within the scope of the arbitration process provided for in this Article and Articles 25A to 25G shall not be submitted to arbitration if the issue falls within the scope of a case with respect to which an arbitration panel or similar body has previously been set up in accordance with a bilateral or multilateral convention that provides for mandatory binding arbitration of unresolved issues arising from a mutual agreement procedure case.

  • Systems The details of any systems work will be determined after a thorough business analysis. System's work will be billed on a time and material basis. Investors Bank provides an allowance of 10 systems hours for data extract set up and reporting extract set up. Additional hours will be billed on a time and material basis.

Time is Money Join Law Insider Premium to draft better contracts faster.