Development Capacity Sample Clauses

Development Capacity. Manufacturer agrees that it shall maintain its capability to meet Distributor’s research and development requests for the development of Initial Products as reasonably requested by Distributor and Future Products as determined by the Steering Committee. The roles and titles of the manager-level employees of Manufacturer related to the Business are specified on Schedule I attached hereto (the “Business Employees Baseline”). Manufacturer shall provide Distributor with an updated schedule at least semi-annually during the Term, identifying any changes in the roles and titles of the employees then
AutoNDA by SimpleDocs

Related to Development Capacity

  • Development Work Do, or cause to be done, such development and other work as may be reasonably necessary to protect from diminution and production capacity of the Mortgaged Property and each producing well thereon.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • Development Diligence Novartis shall dedicate commercially reasonable efforts, during each [**] month period, necessary to continue the advancement of Licensed Compounds and Licensed Products with respect to at least one Profile towards the next clinical Development milestone or approval milestone, as described in Sections 7.4.2 or 7.4.3, respectively. If Novartis (itself or through its Affiliates or sublicensees) fails to dedicate commercially reasonable efforts, during any [**] month period, necessary to continue the advancement of Licensed Compounds and Licensed Products with respect to at least one Profile towards such next milestone, then any dispute regarding Novartis’ failure of development diligence with respect to such Profile shall be resolved in accordance with Article 13.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones)

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.

Time is Money Join Law Insider Premium to draft better contracts faster.