Design Review Comment Log Sample Clauses

Design Review Comment Log. Develop and maintain a list of City comments on drawings, specifications, and construction cost estimates at the 30%, 60%, and 90% project stages. Consultant will provide response to design review comments, with the City to determine resolution on items.
AutoNDA by SimpleDocs
Design Review Comment Log. Submittal to City at the end of subsequent design phase (i.e., responses to City comments from 60 Percent Designs will be provided with submittal of 90 Percent Designs).

Related to Design Review Comment Log

  • Design Review At appropriate stages of design, documented reviews of the design results shall be planned and conducted. Participants at each Design Review shall include representatives of all functions concerned with the design stage being reviewed, as well as other specialist personnel, as required. Records of such reviews shall be maintained. Any computer software used to perform alternative calculations or verify clearances through the use of scale models or computer-aided design and drafting (CADD) techniques shall be validated before the use of the application, with validation documented in accordance with Section 2.2.15. In addition, at each submittal to IFA for review, Developer shall provide hand calculations that validate any calculations performed by computer software.

  • Project Review A. Programmatic Allowances

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Review Stages The Project Architect shall submit documents to the Owner for review at completion of the Schematic Design Phase, Design Development Phase and at the following stages of completion of the Construction Documents Phase as follows: 50%, 75%, 100%

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • System Impact Study An assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights.

  • Program Review The Contracting Officer or other authorized government representative may hold semi- annual program review meetings. Such meetings will be held via telecom or video teleconferencing. However, the Government reserves the right to request a meeting in person. The meetings will include all BPA holders, representatives from prospective customer agencies, a combination of current and prospective customer agencies, or individual BPA holders. Some Federal Government Agencies and any approved State, Local and Tribal agencies may establish a central program management function. Such users may require their primary suppliers to participate in agency program review meetings on a periodic basis, at no additional cost to the Government.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Readiness Review Includes all plans to be implemented in one or more Service Areas on the anticipated Operational Start Date. At a minimum, the HMO shall, for each HMO Program:

Time is Money Join Law Insider Premium to draft better contracts faster.