Construction Works involves the Marine Travel Routes Sample Clauses

Construction Works involves the Marine Travel Routes. The work scope of this Contract does not include marine construction or vessel operation related to construction works. With reference to AECOM letter “Environmental Permit No. EP-353/2009/I EP Condition 2.8 – Marine Travel Route Plan” (Ref: HKBCF/(VCP)(HY/2013/03)/ M45/100(0013)/B300436) dated on 4 August 2015, it was confirmed that all materials would be delivered from land and no marine transportation required. However, referring to Engineer’s Representative instruction (AECOM), (Ref: HKBCF/(VCP)(HY/2013/03) /C15/450(0001)/B301226) dated on 16 October 2015(Appendix B), CHEC is required to dispose the excavated marine sediment generated at designated disposal sites within Hong Kong as allocated by the Marine Fill Committee. Dumping permit has been applied under the Dumping at Sea Ordinance issued by EPD for the marine disposal works. With reference to submission of Variation to Environmental Permit (6th Submission – Version 2.4) (Ref: CHEC300/OUT/2016/01/04.06/003897) dated on 5 January 2016, floating concrete batching plant will be used for providing concrete supply to construction on HKBCF. Raw material for concrete production will be delivered to the floating concrete batching plant from mainland by pelican barge. After reviewing of the construction programme, the oversize precast segment will be transported from mainland by dry cargo barge. Also, temporary asphalt mixing facility will be used for providing asphalt supply to construction on HKBCF. Raw material for asphalt production will be delivered from mainland by pelican barge. With reference to AECOM letter (Ref: HKBCF/(VCP)(HY/2013/03)/ C15/440()/B314281) dated on 8 May 2017 (Appendix B), CHEC was requested to deliver surplus filling material from HKBCF project to the TM-CLKL project by marine access. With reference to Airport Authority Hong Kong’s Consent letter (Ref: PSU/3206/O/205) dated on 12 June 2017 (Appendix C), CHEC was approved to deliver surplus filling material from HKBCF project to the Airport Authority Hong Kong’s Three Runway Project by marine access, the disposal location at Three Runway Project is only sand blanket filling area which presented in Figure 1 and Figure 3. 中國港灣工程有限公司 Regular Marine Travel Routes Plan China Harbour Engineering Co., Ltd. Contract No.: HY/2013/03
AutoNDA by SimpleDocs

Related to Construction Works involves the Marine Travel Routes

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Approved Services; Additional Services Registry Operator shall be entitled to provide the Registry Services described in clauses (a) and (b) of the first paragraph of Section 2.1 in the Specification 6 attached hereto (“Specification 6”) and such other Registry Services set forth on Exhibit A (collectively, the “Approved Services”). If Registry Operator desires to provide any Registry Service that is not an Approved Service or is a material modification to an Approved Service (each, an “Additional Service”), Registry Operator shall submit a request for approval of such Additional Service pursuant to the Registry Services Evaluation Policy at xxxx://xxx.xxxxx.xxx/en/registries/rsep/rsep.html, as such policy may be amended from time to time in accordance with the bylaws of ICANN (as amended from time to time, the “ICANN Bylaws”) applicable to Consensus Policies (the “RSEP”). Registry Operator may offer Additional Services only with the written approval of ICANN, and, upon any such approval, such Additional Services shall be deemed Registry Services under this Agreement. In its reasonable discretion, ICANN may require an amendment to this Agreement reflecting the provision of any Additional Service which is approved pursuant to the RSEP, which amendment shall be in a form reasonably acceptable to the parties.

  • Technical Specifications 1. A procuring entity shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with the purpose or effect of creating an unnecessary obstacle to trade between the Parties.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Professional Improvement Leave A teacher may be granted leave to be used for the teacher's professional improvement. Professional improvement days may be approved by the superintendent and used for the purpose of:

  • Developer’s Attachment Facilities (“DAF”). Developer shall, at its expense, design, procure, construct, own and install the DAF, as set forth in Appendix A hereto.

  • Construction Phase Services 3.1.1 – Basic Construction Services

Time is Money Join Law Insider Premium to draft better contracts faster.