Carpentry Work Sample Clauses

Carpentry Work installation, removal and repair of: sheet rock, non-motorized or non-acoustic doors; floor tile, ceiling tile, and carpeting (including all floor coverings on stairs); assembly, disassembly and repair of bookcases, shelves, tables and the like.
AutoNDA by SimpleDocs
Carpentry Work. The timber shall be properly planned and wrought in a xxxxxxx like manner. Joints shall be true and properly fit, assembled accurately and clamped together so as to make square, flat, and close joints. No timber shall be painted, tarred without the previous permission of the Architects/Engineer-in- Charge, No glue or wedges shall be allowed to be used and all woodwork before being erected shall be passed by Architects/Engineer-in-Charge. In wrought timber, tolerance of 1.5 mm will be allowed for each wrought face of size specified except where described as "finished" in which case they shall have to be the full dimensions. The rate, for wood work, shall include the cost of all sawing, planning, framing, labour and materials and fixing and supply of all traps, bolts, nails, spikes, keys, wedges, pins, screws, glues, etc. necessary for the framing and fixing joints, Portions inserted in the masonry/floor shall not be allowed for the measurements.
Carpentry Work. This includes Repairs & maintenance of all doors, windows, locks & latches, bolts, door closers etc. carpentry works at the premises is included in carpentry work. Required equipment & material are to be provided by contractor.

Related to Carpentry Work

  • Dirty Work Where an employee and their supervisor agree that work (other than ship repair work) is of an unusually dirty or offensive nature, the employee shall be entitled to 43 cents per hour extra. Where an employee and their supervisor agree that certain ship repair work is of an unusually dirty or offensive nature, the employee shall be entitled to 58 cents per hour extra.

  • Day Work (a) The normal work week shall be thirty-seven and one-half (37½) hours and the normal work day shall be seven and one-half (7½) consecutive hours, exclusive of a meal period, between the hours of 6:00 a.m. and 6:00 p.m. The normal work week shall be Monday to Friday inclusive.

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Tenant Improvements Subject to the terms and conditions hereof, Landlord agrees, at its cost and expense to complete a “turnkey” interior build-out (“Tenant Improvements”) of the Leased Premises in accordance with the conditions stated in the Work Letter attached hereto as Exhibit C and incorporated hereby pursuant to the Approved Final Plans to be finalized and approved in accordance with the Work Letter and upon approval attached thereto. Any changes or modifications to the Approved Final Plans thereafter must be done in writing and signed by both Tenant and Landlord in accordance with the Work Letter. So long as in accordance with Article 19 of this Lease, Tenant agrees that Landlord shall be entitled to select, in its reasonable discretion and acting in good faith, all architects, engineers, contractors and material suppliers necessary to furnish the labor and materials for the construction of the Tenant Improvements. Landlord shall be the sole contracting party with respect to the employment of contractors which perform the work necessary to construct the Tenant Improvements. Tenant shall not be entitled to access to the Leased Premises prior to the Date of Substantial Completion and Tenant shall not interfere with or impair in any material way the construction of the Tenant Improvements, and any such interference or impairment shall be included within a Tenant Delay as defined in the Work Letter and shall entitle Landlord to all remedies provided herein for breach of this Lease. Prior to the Possession Date, Tenant shall not enter into any contract for construction of any improvements within the Leased Premises with any person other than Landlord without Landlord's prior written consent. Tenant, at Tenant's expense, shall obtain and maintain any and all necessary permits and licenses to enable Tenant to conduct Tenant’s Permitted Use, and the failure of Tenant to obtain or maintain same shall not in any manner affect the Tenant’s obligations hereunder. Landlord shall be solely responsible, at its cost and expense, for obtaining all permits and approvals related to the Tenant Improvements.

  • Emergency Work Employees who are required to report for emergency work on non- workdays, or outside of their regular hours of work on a scheduled workday or on holidays which they are entitled to have off, shall be paid overtime compensation for the actual work time and for travel time in connection therewith, but such travel time shall not exceed one-half (1/2) hour.

  • Make-Ready Work The term “make-ready work” refers to all work performed or to be performed to prepare SWBT’s poles, ducts, conduits, rights-of-way, and related facilities for the requested occupancy or attachment of Applicant’s facilities. Make-ready work does not include the actual installation of Applicant’s facilities. “Make-ready work” includes, but is not limited to, clearing obstructions (e.g., by “rodding” ducts to ensure clear passage), and rearranging, transferring, replacing, and removing existing facilities on a pole or in a conduit system where such work is required to accommodate Applicant’s facilities (as contrasted with work performed on SWBT’s behalf in furtherance of SWBT’s own business needs or convenience). “Make-ready work” may require “dig-ups” of existing facilities and may include the repair, enlargement or modification of SWBT’s facilities (including, but not limited to, poles, ducts, conduits, handholes, and manholes), consolidating services into fewer cables, or the performance of other work required to make a pole, anchor, duct, conduit, manhole, handhole, or right-of-way usable for the initial placement of Applicant’s facilities. As used in this Agreement, the term “make-ready work” also includes associated planning and engineering work required to confirm or determine the extent of make-ready work required and to plan make-ready projects.

  • Construction Work The regulation at 41 C.F.R. § 60-1.3 defines “construction work” as the construction, rehabilitation, alteration, conversion, extension, demolition or repair of buildings, highways, or other changes or improvements to real property, including facilities providing utility services. The term also includes the supervision, inspection, and other onsite functions incidental to the actual construction.

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • Weekend Work (a) Overtime work on Saturday shall be paid for at the rate of time and a half (1.5) for the first two (2) hours and double time thereafter, provided that all overtime worked after 12 noon on Saturday shall be paid for at the rate of double time.

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

Time is Money Join Law Insider Premium to draft better contracts faster.