Barge Loading Sample Clauses

Barge Loading. To meet its obligations under Section 3.3 above, United shall arrange for an appropriate number of barges to be available for loading at each Cargo loading facility on the date specified by the Cargo supplier (“Barge Loading Date”). Tampa Electric shall cause its Cargo suppliers to coordinate with United in advance so as to provide for the scheduling of barge placement. United, free of expense to Tampa Electric, shall coordinate the planning and scheduling of the barge loading with the Cargo supplier, all within the monthly schedule set by Tampa Electric. The Cargo loading facility operator, acting as agent of Tampa Electric, may reject any barge which it reasonably believes to be unacceptable for loading. The loading of a barge by a Tampa Electric designated Cargo loading facility operator shall constitute acceptance of the barge by Tampa Electric.
AutoNDA by SimpleDocs

Related to Barge Loading

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Aircraft The Airframe to be sold by AVSA to the Owner Trustee as provided in the Participation Agreement and to be leased under the Lease (or any permitted substitute airframe thereunder) together with two Engines (whether either is an initial Engine or a Replacement Engine) whether or not any of such initial or Replacement Engines may from time to time be installed on such Airframe or may be installed on any other airframe or on any other aircraft, including any aircraft substituted pursuant to Section 11.03

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Vessels Each Vessel is

  • Delivery Location The Aircraft shall be located at the agreed Delivery Location;

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Mission Block Fuel The block fuel for a stage length of 2,050 nautical miles in still air (representative of a route with a 4.4 hour flight time from a sea level airport) with a zero fuel weight of 154,221 kilograms, using the conditions and operating rules defined below, shall not be more than the following guarantee value: NOMINAL: [*] Kilograms TOLERANCE: [*] Kilograms GUARANTEE: [*] Kilograms Conditions and operating rules:

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

Time is Money Join Law Insider Premium to draft better contracts faster.