Aerial Guideway Clause Samples

Aerial Guideway. 1. Contractor shall verify available preset pole support structural capacity per OCS design requirements. 2. Contractor shall remove protective cap and clean inserts, if necessary, to receive OCS pole foundation anchoring assembly.
Aerial Guideway. 1. Contractor shall verify concrete rebar location on deck slabs where non-ballasted tracks are required and coordinate work with the trackway, drainage and bonding requirements in accordance with track types. 2. Contractor shall design and construct track bed to requirements.