Performance Acceptance Tests definition

Performance Acceptance Tests means the performance acceptance tests described in the Scope of Work.
Performance Acceptance Tests means the tests described in Exhibit LL.
Performance Acceptance Tests aims to test and verify performance safety values in the technical agreement under this contract upon the technical agreement.

Examples of Performance Acceptance Tests in a sentence

  • The Performance Acceptance Tests shall be conducted by Powering Up and continuous operation of all the systems on a 24x7 basis to ascertain that all components of the solution are working in the desired fashion individually and together.

  • Surprisingly an analysis along gender lines to establish the most affected infrastructure in local governments as regards quality of constructed works revealed among both the males and females that the buildings sector and water source construction were the most affected as reflected by the relatively high percentages in Figure 4.1a and Figure 4.1b below.

  • CLIENT intends to design and construct the following described project: Provide conceptual design layout of track structure for the proposed Ethanol Facility in Hartsburg Ill.

  • Performance Acceptance Tests (PAT): After installation and charging, System shall be accepted after successful completion of Performance Acceptance Tests (PAT) as under: Performance Ratio (PR)PR= Measured output in kW ×1000 W/m2Installed Plant Capacity(kW) Measured Irradiation intensity in W/m2 Note: Plant Performance Ratio should be at least 75%.

  • After installation and charging, System shall be accepted after successful completion of Performance Acceptance Tests (PAT) as under:Performance Ratio (PR): PR= Measured output inkW × 1000 W/m2 InstalledPlantCapacity(kW) MeasuredIrradiationintensity in W/m2 Note:Plant Performance Ratio should be at least 75%.

  • The prototype pumps then shall cover all relevant hydraulic performance tests in accordance with EN ISO 9906 “Rotodynamic Pumps - Hydraulic Performance Acceptance Tests - Grades 1, 2 and 3”.

  • Performance Acceptance Tests after installation & Commissioning have to be conducted as per Clause No.7.11.

  • The Performance Acceptance Tests shall be conducted by conducting point-to-point and multipoint VC sessions on IP & ISDN within and outside BHEL continuously for 7 days to ascertain that all components of the solution are working in the desired fashion individually and together to give the best VC performance.

  • Performance Acceptance Tests completed satisfactorily and required test forms submitted and approved by the District.

  • The spare parts, the works in the OCC and the Emergency Control Center (ECC), the Integration Acceptance Tests (SIT) and the Performance Acceptance Tests (SPT), along with the commissioning of all Systems can be accepted upon their successful completion at a subsequent stage, in line with the stipulations of Table A, parts A9 and A10.


More Definitions of Performance Acceptance Tests

Performance Acceptance Tests means, as the context may require, the Block Substantial Completion Tests, the Phase Substantial Completion Tests, and the PV Power Plant Substantial Completion Tests.
Performance Acceptance Tests means the tests for establishing compliance with the Minimum Performance Levels for each of Phase 1 or Phase 2, as applicable, required for Substantial Completion, as more fully set out in Appendix D.

Related to Performance Acceptance Tests

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Performance Milestone means an act or event specified in section 5.1 and described in section 9 of the EPLA.

  • Project Milestones means the project milestones set forth in Schedule-G;

  • Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.

  • Project Milestone means the project milestone set forth in Schedule-J;

  • Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • performance requirement means a requirement that:

  • Performance Review means a summative evaluation of a teacher other than a beginning teacher and used to determine whether the teacher’s practice meets school district expectations and the Iowa teaching standards, and to determine whether the teacher’s practice meets school district expectations for career advancement in accordance with Iowa Code section 284.7.

  • Subprojects means more than one such Subproject.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Final completion and acceptance means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Final Completion Date means the date on which Final Completion occurs.

  • Final Acceptance Date means the date on which Final Acceptance occurs.

  • Subproject means a specific water and/or sanitation Subproject financed or to be financed by a Subproject Grant (as hereinafter defined) provided from the proceeds of the Credit under Part C.1 of the Project;

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Utilization review plan or "plan" means a written procedure for performing review.