Materials management plan definition

Materials management plan means a plan which sets out the measures to be adopted when excavating and handling potentially contaminated soil to minimise the risk of cross contamination;
Materials management plan or "MMP" means a plan
Materials management plan or "MMP" means a plan required under section 11571.

Examples of Materials management plan in a sentence

  • Lessee’s indemnification obligations shall include, without limitation, and whether foreseeable or unforeseeable, all costs of any required or necessary Hazardous Materials management plan, investigation, repairs, cleanup or detoxification or decontamination of the Premises, and the presence and implementation of any closure, remedial action or other required plans, and shall survive the expiration of or early termination of the Lease Term.

  • Licensee’s indemnification obligations shall include, without limitation, and whether foreseeable or unforeseeable, all costs of any required or necessary Hazardous Materials management plan, investigation, repairs, cleanup or detoxification or decontamination of the Property, and the presence and implementation of any closure, remedial action or other required plans, and shall survive the expiration of or early termination of the Lease Term.

  • Materials management plan will be developed to manage movement, import, reuse and disposal of materials.

  • When identifying a special educational need, not only attainment needs to be assessed but a child’s social and emotional skills.

  • Hazardous Materials management plan that includes types and quantities expected to be on-site, storage location(s), labeling, handling and tracking requirements.

  • A Hazardous Materials management plan or equivalent documentation shall be developed to minimize the risk associated with transportation, unloading, transfer, storage, handling, use and disposal of Hazardous Materials on Site.

  • Materials management plan part of the research plan We require that you give an account of how the project proposes to obtain its research material, how the material produced by the project will be used and stored and how the subsequent use of the material will be facilitated.

  • Thus, privacy is a constant dilemma for them, as they are meticulous on information disclosure and anticipate data misuse at any given point of time.

  • Asbestos cement pipes might be faced during the construction phase; therefore, a Asbestos Containing Materials management plan will be required for the removal and disposal of these hazardous material.

  • Yet another requests to evaluate the dynamic effects of the increase of the longer wavelength roughness.


More Definitions of Materials management plan

Materials management plan means the document containing the requirement set forth in Section 5.4.1.
Materials management plan. (MMP) shall mean the plan of the same name attached hereto as Attachment 2.

Related to Materials management plan

  • Supply Chain means the individuals and organisations who will be responsible for any of the design and/or construction of the Works as set out in the Schedule of Supply Chain Members;

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Asset Management Plan means a plan created by the department and approved by the state transportation commission or a plan created by a local road agency and approved by the local road agency's governing body that includes provisions for asset inventory, performance goals, risk of failure analysis, anticipated revenues and expenses, performance outcomes, and coordination with other infrastructure owners.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Forest management plan means a written plan prepared and signed by a qualified forester that prescribes measures to optimize production, utilization, regeneration, and harvest of timber. The forest management plan shall include a schedule and timetables for the various silvicultural practices used on forestlands, which shall be a maximum of 20 years in length. A forest management plan shall include all of the following:

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • PD means palladium.

  • Individualized family service plan means a written plan for providing early intervention services to an eligible child and the child’s family.

  • Snow tyre means a tyre whose tread pattern, tread compound or structure is primarily designed to achieve in snow conditions a performance better than that of a normal tyre with regard to its ability to initiate or maintain vehicle motion."

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.