Examples of Storm water management plan in a sentence
Storm water management plan should be implemented so as to prevent sudden discharge of excessive volumes of storm water to the receiving waters thus reducing the shock load on the drainage system and impact on receiving water body.v. Disruption to the natural hydrology of the site should be minimised by reducing impervious cover, increasing on site infiltration and managing storm water run off.vi.
NR 216.455 Proof of permit coverage.NR 216.456 Responsible parties.NR 216.46 Erosion control plan requirements.NR 216.47 Storm water management plan requirements.
Methods of minimizing impacts to receiving water quality resulting from development, including: [1] Storm water management plan development and review; [2] Methods to control downstream erosion impacts; [3] Identification of pollutants of concern; [4] LID BMP techniques; [5] Source control BMPs; and [6] Selection of the most effective treatment control BMPs for the pollutants of concern.
Storm water management plan, calculations and proposed size, nature and location of all proposed storm drainage improvements.
The location, size and configuration of doors, windows, roof, chimneys, exterior grade, footings and foundation walls.(d) Storm water management plan.