Make-Ready Construction definition

Make-Ready Construction means all work that is required to accommodate Licensee’s Wireless Installation on a Service Pole in compliance with the Applicable Engineering Standards. Make-Ready Work may include, but is not limited to, engineering design, electrical construction, communications construction, or Wireless Installation construction. Make-Ready Construction in this context also includes the City’s review of a Right-of-Way Work Permit Application and a Wireless Installation Permit Application, where applicable; engineering design documents; pole loading analysis documents; engineering design work; construction work; permitting work; tree trimming (other than tree trimming performed for normal maintenance purposes); Service Pole replacement, where applicable; and a post-construction inspection.

Examples of Make-Ready Construction in a sentence

  • Based on the Make-Ready Engineering analysis, the Utility shall determine the Utility Make-Ready Construction Cost estimate for labor and material costs, including the cost of ultimate removal and disposal of the old Poles and any permitting costs (such as TxDOT and Railroad Commission permits), as required, and provide this information to the Licensee.

  • In addition, Licensee shall pay the Attachment Fee for any pole, for which the Make-Ready Construction Work, as defined in Article 5.3, has been requested and completed unless Licensee notifies the Lewes BPW within forty-five (45) days of completion of the Make-Ready Construction Work that it will not attach.

  • In addition, Licensee shall pay the Attachment Fee for any pole or overlashing, for which the Make-Ready Construction Work, as defined in Article 5.3, has been requested and completed unless Licensee notifies the Lewes BPW within 45 days of completion of the Make-Ready Construction Work that it will not attach.

  • In addition, Licensee shall pay the Attachment Fee for any pole or overlashing, for which the Make-Ready Construction Work, as defined in Article 5.3, has been requested and completed unless Licensee notifies the LEWES BPW within 45 days of completion of the Make-Ready Construction Work that it will not attach.