Engineering Design Sample Clauses
The Engineering Design clause outlines the responsibilities and standards for preparing and delivering design documents and plans for a project. It typically specifies the required level of detail, compliance with applicable codes and regulations, and the process for review and approval by the client or relevant authorities. This clause ensures that the design phase meets quality and regulatory expectations, reducing the risk of errors or omissions that could impact later stages of the project.
POPULAR SAMPLE Copied 2 times
Engineering Design. Purchasers/Tenants are hereby advised that based on current servicing plans, underground services (including hydro, water and gas systems), street furniture and fixtures, including without limitation, hydro transformers, street lighting, light standards, fire hydrants, and cable, telephone and/or tap boxes may be adjacent to or located within their Lots, Potls or Units or common elements appurtenant to their Potl or Unit. The Vendor reserves the right to re-locate such services if it deems it necessary or expedient to do so, in its sole, absolute and unreviewable discretion. Purchasers/Tenants are hereby advised that any enquiries dealing with the proposed engineering design, lot grading, utility locations or general construction can be directed to Town of Ajax Building Approvals and Engineering Services Section at 619-2529 Ext. 3232. Purchasers/Tenants are hereby advised that residents, visitors and owners of Potls or Units are absolutely prohibited from altering the grading and/or drainage patterns established by the Vendor in respect of the Condominium, and subject to the provisions of the Declaration, by-laws and rules of the Condominium in force from time to time, residents shall not place any tree, fence, shrub, ▇▇▇▇, hedge or other landscaping treatment on any portion of the common elements. Purchasers and/or tenants are advised that this Plan of Subdivision/Plan of Condominium is designed to include rear lot catchbasins. The rear lot catchbasin is designed to receive and carry only clean stormwater. It is the homeowner's responsibility to maintain the rear lot catchbasin in proper working condition by ensuring that the grate is kept clear of ice, leaves and other debris that would prevent stormwater from entering the catchbasin. The locations of rear lot catchbasins are subject to change without notice.
Engineering Design. All new material furnished will be specifically designed to operate with original elevator equipment being retained, thus assuring maximum performance and eliminating any divided responsibility. All material, removed or unused, not required in the modification will become the property of the ▇▇▇▇ Elevator Company and we reserve the right to remove and retain it.
Engineering Design. A. In addition to any other engineering requirements specified in Attachment A or any other provision, Attachment or Schedule of the Agreement, the following services, Drawings and Specifications shall be prepared and provided by Contractor in accordance with Attachment B in respect of all engineering disciplines during engineering of the Project:
1. Completing the engineering design documents, as required, which were developed by Contractor prior to the Agreement Date;
2. Provide engineering support for procurement, transportation, construction, commissioning and assistance to start-up;
3. Performance of all detailed studies, checks and reviews, procedures, and adaptation of design in all disciplines accordingly;
4. Developing and revising drawings sufficient for procurement of Equipment, installation, construction, manufacture, fabrication, commissioning, start-up, testing, operation and maintenance of the Project;
5. Submission of documents for review and comment in accordance with Attachment B;
6. Lead, participate in and action results of technical reviews, including preparation and supply of all required documents for team members;
7. Evaluate and close technical inquiries;
8. Preparation of Equipment data sheets;
9. Preparation of engineering material requisitions and purchase requisitions, and amendments as necessary;
10. Technical evaluation for all major Contractor-Supplied Equipment;
11. Requisitions, and other technical documents and evaluations for the procurement of all necessary bulk material and Contractor-Supplied Equipment;
12. Development and implementation of a plan for witnessing of factory tests at Vendor’s shops for major Contractor-Supplied Equipment;
13. Drawings control, Vendor data and documentation control using a computer database and Contractor’s document control procedure;
14. Provide Vendor’s recommendations for operating spare parts and prepare final operating spare parts list;
15. Develop list of first fills and start-up consumables (including strainers and filters);
16. Development of technical documents for Subcontracts;
17. Provision of engineering support for procurement, construction and commissioning;
18. Preparation of mechanical catalogues and Vendor data books;
19. Provision of all Record As-Built Drawings and Specifications;
20. Drawings and packages required for tie-ins;
21. Development of Equipment lists, instrument index, line lists;
22. Maintenance documentation for all Contractor-Supplied Equipment provided;...
Engineering Design. The design phase is foundational, involving extensive data gathering, analysis, and planning to ensure the projects alignment with the City’s goals. This phase translates the findings from the this effort into detailed plans and specifications, ensuring all technical, regulatory, and requirements are met.
Engineering Design. Site civil design revisions will include preparation of a traffic control plan for the east end of the transfer station and the new pole barn structures. Structural design work will include calculations for pole barn framing and foundations and an evaluation of the existing retaining wall capacity to support the Recycle Center support columns. We have assumed that the improvements can be designed for seismic loads based on the applicable building code and will not require a site-specific seismic evaluation. Electrical work will include interior and exterior lighting in and around the pole barn structures and exterior electrical receptacles at the refrigerant recovery area for use of power tools. We have assumed that no HVAC or mechanical engineering design will be required.
Engineering Design. It may be necessary for the Subdivider, in order to comply with the grading requirements of the Town, to enter upon said Lands in order to complete or alter the grading of such lot and that the conveyance to the purchaser reserves a license to the Subdivider to enter upon said Lands in order to complete or alter any of the grades on the said lot as may be required by the Town in order to provide proper drainage to any of the lots on the plan. The purchaser shall also be advised that the proposed lot grading may require the use of retaining walls and/or sloping. Where retaining walls are constructed on the lot being sold, the purchaser shall be advised that such retaining walls will be maintained in good condition and repair for a period of 2 years from completion of the same, after which time the maintenance and repair of such walls shall be the responsibility of the purchaser (Section 14.(2)(c)).
Engineering Design. The Contractor shall develop all the necessary engineering design and specifications of the chillers and associated equipment sizing and selection, quality control and drawings. The engineering designs and drawings shall comply with the applicable legislation and local and international codes and standards such as OHS Act, NEMA, ASHRAE, SANS, EI etcetera. The Contractor shall ensure timeous submissions of the designs and drawings to the relevant Authorities for approvals and permission to proceed, including any negotiations in this regard.
Engineering Design. We will prepare a preliminary design including limits of stabilization. We will then subcontract with our structural engineer to calculate appropriate structural details.
Engineering Design. The first objective of this task is to update the coastal processes acting at the site and develop a preliminary design and cost estimate. Provider will evaluate analyses and incorporate lessons learned from the Follet’s Island Nearshore Beach Nourishment Project (CEPRA 1583), Treasure Island Revetment Evaluation Project (CEPRA 1442), San ▇▇▇▇ Pass Inlet Management Plan (CEPRA 1384), and Treasure Island MUD Beach Nourishment Regulatory Permitting (CEPRA 1642) projects to improve the project performance. This second objective of this task is to develop a final design and 100% level construction documents to construct the project.
Engineering Design. This is the design of components, systems, circuits and equipment; machine technical guidelines, components and elements used in the plant construction and assembly; estimation records to determine the physical dimensions and volume of materials needed to build the Plant. The product to be delivered in this stage shall be documents and layouts supporting the detail engineering in the civil, mechanical, piping, electricity and instrumentation fields pursuant to the Contractor’s bid. On the other hand, Sulfatos Chile shall authorize the construction of the SX- CR plant based on the reviewed deliverables (layouts and documents) under the category of “approved for construction”. The maximum term for approval or rejection shall be 2 (two) business days. Staffing and provision of any kind of material resources, in the required amounts and qualities in order to execute the engineering works, that are not set forth in the tender guidelines as a contribution of Sulfatos Chile, shall be provided by the Contractor.