Frame Delay Variation definition

Frame Delay Variation also known as packet jitter, is a measurement of the average variation (measured in milliseconds) in the time delay for packet transfers between two performance test frames. Frame Delay Variation is determined by Crown Castle by averaging sample measurements taken each calendar month between designated points of presence. If Frame Delay Variation in any month exceeds the number of milliseconds set forth in the table below and such failure is quality- impacting, Licensee shall be entitled to a Product Credit equal to the percentage of the applicable MRC set forth in the following table: FRAME DELAY VARIATION CoS Designation - % of MRC Domestic US Standard Business Priority Business Critical Mission Critical 2ms or less No Credit No Credit No Credit No Credit >2ms to 3ms No Credit No Credit No Credit 10% >3ms to 4ms No Credit 10% 15% 30% >4ms 10% 20% 30% 50%
Frame Delay Variation also known as packet jitter, is a measurement of the average variation (measured in milliseconds) in the time delay for packet transfers between two performance test frames. Frame Delay Variation is determined by Service Provider by averaging sample measurements taken each calendar month between designated points of presence. If Frame Delay Variation in any month exceeds the number of milliseconds set forth in the table below and such failure is service-impacting, Subscribing Entity shall be entitled to a Service Credit equal to the percentage of the Service MRC set forth in the following table: FRAME DELAY VARIATION CoS Designation - % of MRC Domestic US Standard 2ms or less No Credit >2ms to 3ms No Credit >3ms to 4ms No Credit >4ms 10%

Examples of Frame Delay Variation in a sentence

  • The monthly Jitter / Frame Delay Variation is calculated as the average of all of the frame delay variation measurements during such calendar month and is expressed in milliseconds (ms).

  • Jitter or Frame Delay Variation is defined as the variation in delay for two consecutive frames that are transmitted (one way) from a network origination point and received at a network destination point (TWC network hub to TWC network hub).

  • In no event shall Product Credits in any month for any and all interruptions, disruptions, failures, and/or degradations in quality (including, without limitation, any Product Failures or failure to meet any Network Latency, Frame Delivery Rate (Packet Loss), Frame Delay Variation (Jitter) or other objectives or parameters set forth in this Supplement) exceed fifty percent (50%) of the MRC for the affected Product for that month.

  • Product Credits issued to Licensee hereunder shall be Licensee’s sole and exclusive remedy at law or in equity on account of any Outage and/or failure to meet any objectives or parameters (including, without limitation, Network Latency, Frame Delivery Rate (Packet Delivery) or Frame Delay Variation (Jitter)) set forth in this Supplement.

  • If a Priority 3 Incident arises because the average Frame Delay, Frame Delay Variation or Frame Loss has not met the Service degradation Service Levels, Customer may claim a Service Credit calculated as 20% of the pro-rata Monthly Recurring Charge for the affected EVC for the period that the applicable Service degradation Service Level has not been met for that EVC.

  • The value is provided as an average per calendar month;• Frame Delay Variation (= Frame Jitter) – variation of Frame Delay between the source and destination UNI.

  • Inter-Frame Delay Variation (Jitter)The ten (10) minute average for Inter- Frame Delay Variation of the Bidder’s service, as defined by the MEF standards in MEF 10.3, must be < 2ms.

  • The below values of the following performance parameters (Frame Loss, Frame Delay, Frame Delay Variation) are common (approximate) in the backbone network of the Provider and in the access network with regard to provision of GTS Ethernet Line.

  • The service has an expectation of low Frame Delay, Frame Delay Variation and Frame Loss Ratio.

  • This standard facilitates not only fault management, but also performance management (by Frame Loss Ratio, Frame Delay and Frame Delay Variation).

Related to Frame Delay Variation

  • Tenant Delays A "Tenant Delay" shall mean any delay in Substantial Completion of the Building as a result of any of the following: (i) Tenant's failure to complete or approve the Tenant Improvement Plans by the dates set forth in Section 5.B, (ii) Tenant's failure to approve the bids for construction by the dates set forth in Section 5.C, (iii) changes to either the Shell Plans and Specifications or the Tenant Improvement Plans requested by Tenant which delay the progress of the work, (iv) Tenant's request for materials, components or finishes which are not available in a commercially reasonable time given the target Commencement Date, (v) Tenant's failure to make a progress payment for Tenant Improvement costs as provided in Section 5.F, (vi) Tenant's request for more than one (1) rebidding of the cost of all or a portion of the work, and (vii) any errors or omissions in the Tenant Improvement Plans provided by Tenant's architect. In the event Landlord believes Tenant is causing a Tenant Delay, Landlord shall notify Tenant in writing, state the action or inaction that it believes is causing the Tenant Delay, and state the date from which a Tenant Delay is being calculated. Claim of Tenant Delay shall be made within five (5) days after Landlord's discovery of the occurrence of the event giving rise to such claim. Tenant shall have the right to expedite work, at its sole cost, to minimize the effect of any Tenant Delays, to the extent it is practicable to do so. However, no Tenant Delay shall advance the Commencement Date to a date before the estimated Commencement Date of October 1, 2001. Notwithstanding anything to the contrary set forth in this Lease and regardless of the actual date the Premises are Substantially Complete (but subject to the limitation in the preceding sentence), the Commencement Date shall be deemed to be the date the Commencement Date would have occurred if no Tenant Delay had occurred as reasonably determined by Landlord. In addition, if a Tenant Delay results in an increase in the cost of the labor or materials, Tenant shall pay the cost of such increases.

  • Force Majeure Delays means any actual delay in the construction of the Tenant Improvements, which is beyond the reasonable control of Landlord or Tenant, as the case may be, as described in Paragraph 33 of the Lease.

  • Service Variation has the meaning attributed to it in paragraph 7.1;

  • Excusable Delays means delays due to acts of terrorism, acts of war or civil insurrection, strikes, riots, floods, earthquakes, fires, tornadoes, casualties, acts of God, labor disputes, governmental restrictions or priorities, embargoes, national or regional material shortages, failure to obtain regulatory approval from any Federal or State regulatory body, unforeseen site conditions, extraordinary rainfall or snowfall, or any other condition or circumstances beyond the reasonable or foreseeable control of the applicable Party using reasonable diligence to overcome which prevents such Party from performing its specific duties or obligation hereunder in a timely manner; provided, however, Excusable Delay does not include lack of financing, unanticipated or unexpected increases in the costs of construction, or errors in business judgment by a Party; and provided further that Excusable Delay shall only extend the time of performance for the period of such Excusable Delay, which shall begin on the date which the event of Excusable Delay first occurs and extend until the date which the event which has caused the Excusable Delay has been corrected or performed, or reasonably should have been corrected or performed.

  • Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.

  • Excusable Delay means a delay due to acts of God, governmental restrictions, stays, judgments, orders, decrees, enemy actions, civil commotion, fire, casualty, strikes, work stoppages, shortages of labor or materials or other causes beyond the reasonable control of Borrower, but lack of funds in and of itself shall not be deemed a cause beyond the control of Borrower.

  • Tenant Delay Any event or occurrence that delays the completion of the Landlord Work which is caused by or is described as follows:

  • Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Additional SDU Study means a deliverability study that a Developer may elect to pursue as that term is defined in OATT Section 25 (OATT Attachment S). For purposes of Section 23.4.5 of this Attachment H, “Affiliated Entity” shall mean, with respect to a person or Entity:

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • BASE budget means the minimum general fund budget of a district, which includes 80% of the basic

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Baseline Schedule means the initial time schedule prepared by Contractor for Owner’s information and acceptance that conveys Contractor’s and Subcontractors’ activities (including coordination and review activities required in the Contract Documents to be performed by A/E and ODR), durations, and sequence of work related to the entire Project to the extent required by the Contract Documents. The schedule clearly demonstrates the critical path of activities, durations and necessary predecessor conditions that drive the end date of the schedule. The Baseline Schedule shall not exceed the time limit current under the Contract Documents.

  • Base Building Work means the base building work for the Building as described in this Manual.

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;

  • Excused Downtime means the number of minutes in the Charging Period, rounded to the nearest minute that the link state of Customer’s Port is ‘down’ due to:

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • piece-work means any work the pay for which is estimated by the amount of work performed irrespective of the time occupied in its performance;

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Unit Price Work means the Work, or a portion of the Work, paid for based on incremental units of measurement.

  • Non-Extension Drawing has the meaning specified in Section 3.5(d).

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Change Order means a written order to the Contractor signed by the Contracting Officer, issued after execu- tion of the Contract, authorizing a change in the term or scope of the Contract.

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.