Avoided Energy Cost definition

Avoided Energy Cost means Buyer’s avoided energy cost per MWh set in the Buyers’ Standard Rate Rider LQF or a successor provision of Buyers’ tariffs, expressed in Dollars.
Avoided Energy Cost refers to a calculation, determined for the load zone applicable to the Customer. “Net energy metering” measures the reverse flow of electricity so as to register the difference between the electricity supplied to the Customer and the electricity provided to the Company by the Customer’s generating equipment.
Avoided Energy Cost refers to a calculation, determined for the load zone applicable to the Customer. “Net energy metering” measures the reverse flow of electricity so as to register the difference between the electricity supplied to the Customer and the electricity provided to the Company by the Customer’s generating equipment. Credits will be determined and applied by LDC, as appropriate, to each time period. Marathon is not responsible for reconciling net energy and/or applying net energy credits to the Customer or calculating the Customer’s Avoided Energy Costs. The Customer must notify Marathon of their generation and net metering equipment, if any, prior to enrollment or, once enrolled, sixty (60) days written notification must be submitted to Marathon prior to installation of net metering equipment. Marathon reserves the right to modify your Rate or terminate this Agreement and recover costs, if any. Marathon will invoice Customer monthly for natural gas/electricity delivered under this Agreement, as measured by the LDC. The undersigned Customer agrees to pay each invoice in full within twenty (20) days of the invoice date. It is agreed that the entire outstanding balance shall become due and payable upon a default in payment of any invoice. If any invoice is not paid when due, Customer further agrees to pay

Examples of Avoided Energy Cost in a sentence

  • The calculation of payments to the QS shall be based on the sum, over all hours of the billing period, of the product of each hour's applicable Projected Avoided Energy Cost times the purchases of energy from the QS by the Company for that hour.

  • Off-Peak Monthly Avoided Energy Cost shall be calculated as follows:∑𝑖 𝐷𝐴𝑃 𝑆𝑒𝑡𝑡𝑙𝑒𝑚𝑒𝑛𝑡 𝑃𝑟𝑖𝑐𝑒𝑖𝑛Where:i = 1…n;DAP Settlement Price – shall be based on the SPP DA LMP settlement prices for the AEPM_CSWS (or its successor) price node for Off-Peak hours; n = Count of Off-Peak hours of the month.

  • Avoided Energy Cost: The Avoided Energy Cost means eighty-two and four tenths percent (82.4%) of the monthly arithmetic average of each day’s ICE Mid-C Physical Peak (bilateral) and Mid-C Physical Off-Peak (bilateral) average index prices.

  • Average Avoided Energy Cost: Average Avoided Energy Cost is the average cost of Supplemental Energy, including both energy and capacity charges, billed to the Company by Consumers Energy Company, based on the rolling average of the six consecutive months ending on the last day of the second month prior to the month that purchases are made by the Company (e.g., the August billing month cost will be calculated using the avoided energy costs for the six months ending in June).

  • The customer may elect to sell energy to the Company at the Company's Average Avoided Energy Cost.

  • Average Avoided Energy Cost Average Avoided Energy Cost is the weighted average energy cost incurred by the Cooperative under the Joint Operating Agreement with Wisconsin Electric Power.

  • The As-Available Rate is based on the Avoided Energy Cost for surplus energy at the time of delivery.

  • Avoided Energy Cost (Illustrative)In this illustration L represents the measured load in any given hour, and P represents the corresponding price (the MISO day-ahead clearing price).

  • Benefit/Cost Bases ComponentBenefit/Cost Basis Avoided Energy Cost Hourly avoided wholesale market procurements, based on ISO New England day ahead locational marginal prices for the Maine Load Zone.

  • Therefore, BVES will pay 3.43% of the Avoided Energy Cost compensation rate for avoided transmission and distribution losses compensation.

Related to Avoided Energy Cost

  • Net energy billing means a billing and metering practice under which a customer-generator is billed on the basis of net energy over the billing period.

  • LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L4 : Widening of Boundary Patrol Road (Area D) (EPIW) (Option 1) Lump Sum Item LSL4.7 L4.7 : Diversion of Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL4.7 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Energy Charge means a charge for each kilowatt-hour (kWh) of electrical energy;

  • LCC-300 Cost Centre G Terminus Building : E&M Works Lump Sum Breakdown G4 : Plumbing and Drainage Lump Sum Item LSG4.4 G4.4 : Cold Water Installation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". sum *** *** *** ------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSG4.4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Net energy metering means the difference between the kilowatt-hours consumed by a customer-generator and the kilowatt-hours generated by the customer- generator's facility over any time period determined as if measured by a single meter capable of registering the flow of electricity in two directions.

  • LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Connection Income Taxes means Other Connection Taxes that are imposed on or measured by net income (however denominated) or that are franchise Taxes or branch profits Taxes.

  • Assigned Annual Special Tax means the Special Tax of that name described in Section D.

  • Additional Transportation Cost means the actual cost incurred for one-way Economy Transportation by Common Carrier reduced by the value of an unused travel ticket.

  • Asset Taxes means all ad valorem, property, excise, severance, production or similar Taxes (including any interest, fine, penalty or addition to Tax imposed by a taxing authority in connection with such Taxes) based upon operation or ownership of the Assets or the production of Hydrocarbons therefrom but excluding, for the avoidance of doubt, (a) income, capital gains, franchise and similar Taxes and (b) Transfer Taxes.

  • Energy Code means the State Energy Conservation Construction Code, as currently in effect and as hereafter amended from time to time.

  • State premium tax liability means any liability

  • Energy Payment The amount that Company will pay Seller for electric energy delivered to Company in accordance with the terms and conditions of this Agreement on a monthly basis as set forth in Attachment J (Company Payments for Energy, Dispatchability and Availability of XXXX) to this Agreement.

  • boycott energy company means “without an ordinary business purpose, refusing to deal with, terminating business activities with, or otherwise taking any action intended to penalize, inflict economic harm on, or limit commercial relations with a company because the company (a) engages in the exploration, production, utilization, transportation, sale, or manufacturing of fossil fuel-based energy and does not commit or pledge to meet environmental standards beyond applicable federal and state law, or (b) does business with a company described by paragraph (a).” (See Tex. Gov. Code 809.001). When applicable, does Vendor certify? Yes 5 Felony Conviction Notice - Texas Education Code 44.034 9 Texas Education Code, Section 44.034, Notification of Criminal History, Subsection (a), states, "a person or business entity that enters into a contract with a school district must give advance notice to the district if the person or an owner or operator of the business entity has been convicted of a felony. The notice must include a general description of the conduct resulting in the conviction of a felony.” Subsection (b) states, "a school district may terminate a contract with a person or business entity if the district determines that the person or business entity failed to give notice as required by Subsection (a) or misrepresented the conduct resulting in the conviction. The district must compensate the person or business entity for services performed before the termination of the contract.” Subsection (c) states, "This section does not apply to a publicly held corporation. Vendor certifies one of the following:

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Transportation Costs means costs of travel as a fare paying passenger in any Common Carrier Conveyance other than a taxicab.

  • Backup Annual Special Tax means the Special Tax of that name described in Section E.

  • Renewable Energy Credit has the meaning set forth in California Public Utilities Code Section 399.12(h) and CPUC Decision 00-00-000, as may be amended from time to time or as further defined or supplemented by Law.

  • Rate Center Area means the following in each applicable area:

  • Energy year or "EY" means the 12-month period from June 1st

  • Anticipated county property tax revenue availability means the

  • Annual Special Tax means the Special Tax actually levied in any Fiscal Year on any Assessor’s Parcel.

  • Renewable Energy Credits means a certificate, credit, allowance, green tag, or other transferable indicia, howsoever entitled, allocated, assigned or otherwise awarded or certified by any Governmental Authority, program administrator, certification board or similar entity in connection with the production or generation of each MWh of energy from the Project. For the avoidance of doubt, “Renewable Energy Credits” shall not include any ITC, State Renewable Energy Incentives or other tax benefits, credits, or incentives.

  • Salvage Yard means any non-residential property used for the storage, collection, and/or recycling of any type of equipment, and including but not limited to vehicles, appliances and related machinery.