LCC-300 Cost Centre F definition

LCC-300 Cost Centre F. Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre F. Terminus Building - ABWF Lump Sum Breakdown F1 : Station Lump Sum Item LSF1.1 F1.1 : Station - ABWF One hour fire rated doors and frames; as Appendix AA to Particular Specification, section L20 (Cont'd) Galvanised steel with paint finish; door type 01C; door frame width 210mm (max.); head and jamb type A AE320.13 1050mm width x 2150mm high nr *** *** ***
LCC-300 Cost Centre F. Terminus Building - ABWF Lump Sum Breakdown F1 : Station Lump Sum Item LSF1.1 F1.1 : Station - ABWF Walls and columns (Cont'd) Ceramic internal corner tiles; glazed; as Appendix AA to Particular Specification, section M40 AK130.6 size 50 x 50 x 7 mm thick; matt finish m *** *** ***

More Definitions of LCC-300 Cost Centre F

LCC-300 Cost Centre F. Terminus Building - ABWF Lump Sum Breakdown F1 : Station Lump Sum Item LSF1.2 F1.2 : Station Plant Rooms - ABWF Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". -------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF1.2 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre F. Terminus Building - ABWF Lump Sum Breakdown F1 : Station Lump Sum Item LSF1.1 F1.1 : Station - ABWF Mirrors
LCC-300 Cost Centre F. Terminus Building - ABWF Lump Sum Breakdown F1 : Station Lump Sum Item LSF1.1 F1.1 : Station - ABWF Framed glass screens (Cont'd) Clear toughened laminated glass; 12mm thick; as Appendix AA to Particular Specification, section L40 and Drawing nr LCC300/31/A23/001, 002 AQ420.10 fixed to stainless steel framing; size of typical bay 600 x 1440mm high m2 *** *** ***
LCC-300 Cost Centre F. Terminus Building - ABWF Pricing Schedule F3 : Government Accommodation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Pricing Schedule and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". --------------------------------------------------------------------------------------------------------- To Collection of Activity Xxxx F3 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre F. Terminus Building - ABWF Pricing Schedule F5 : Shared Facilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------------------- To Collection of Activity Xxxx F5 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre F. Terminus Building - ABWF Lump Sum Breakdown F1 : Station Lump Sum Item LSF1.1 F1.1 : Station - ABWF Locks, latches and bolts; as Appendix AA to Particular Specification, section P21 (Cont'd)
LCC-300 Cost Centre F. Terminus Building - ABWF Lump Sum Breakdown F1 : Station Lump Sum Item LSF1.2 F1.2 : Station Plant Rooms - ABWF Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 section 7 -------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF1.2 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]