LCC-300 Cost Centre definition

LCC-300 Cost Centre. L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L4 : Widening of Boundary Patrol Road (Area D) (EPIW) (Option 1) Lump Sum Item LSL4.7 L4.7 : Diversion of Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL4.7 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre. L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L1 : Widening of Lok Ma Xxxx Road (Area A) (EPIW) (Option 1) Lump Sum Item LSL1.9 L1.9 : Irrigation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSL1.9 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre. G : Terminus Building - E&M Works Lump Sum Breakdown G1 : ECS Lump Sum Item LSG1.3 G1.3 : Ventilation Systems Equipment and ancillaries(Cont'd) Ventilation fans; complete with all necessary accessories and connections (Cont'd) BB0601.116 centrifugal type; air flow rate 0.50 m3/s; 300 Pa; ref TEF-005 & 006 nr *** *** *** BB0601.117 centrifugal type; air flow rate 0.56 m3/s; 400 Pa; ref TEF-013, 014, 205 & 206 nr *** *** *** BB0601.118 centrifugal type; air flow rate 0.58 m3/s; 400 Pa; ref TEF-101 & 102 nr *** *** *** BB0601.119 centrifugal type; air flow rate 0.64 m3/s; 400 Pa; ref TEF-601 & 602 nr *** *** *** BB0601.120 centrifugal type; air flow rate 0.84 m3/s; 400 Pa; ref TEF-411 & 412 nr *** *** *** BB0601.121 centrifugal type; air flow rate 0.98 m3/s; 400 Pa; ref TEF-413 & 414 nr *** *** *** -------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSG1.3 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

More Definitions of LCC-300 Cost Centre

LCC-300 Cost Centre. G : Terminus Building - E&M Works Lump Sum Breakdown G1 : ECS Lump Sum Item LSG1.3 G1.3 : Ventilation Systems Ductwork ancillaries(Cont'd) Exhaust air grilles; complete with opposite blade dampers BB0603.88 100 x 100mm nr *** *** *** BB0603.89 150 x 100mm nr *** *** *** BB0603.90 150 x 150mm nr *** *** *** BB0603.91 170 x 170mm nr *** *** *** BB0603.92 200 x 100mm nr *** *** *** BB0603.93 200 x 150mm nr *** *** *** BB0603.94 200 x 200mm nr *** *** *** BB0603.95 200 x 250mm nr *** *** *** BB0603.96 225 x 225mm nr *** *** *** BB0603.97 250 x 150mm nr *** *** *** BB0603.98 250 x 250mm nr *** *** *** BB0603.99 250 x 300mm nr *** *** *** BB0603.100 300 x 150mm nr *** *** *** BB0603.101 300 x 200mm nr *** *** *** BB0603.102 350 x 250mm nr *** *** *** BB0603.103 375 x 375mm nr *** *** *** BB0603.104 400 x 400mm nr *** *** *** ------------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSG1.3 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre. L : EPIW STRUCTURE (OPTION 1) Lump Sum Breakdown L2 : Widening Existing Access Road (Area B) (EPIW) (Option 1) Lump Sum Item LSL2.11 L2.11 : Diversion of Existing Telephone Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 ------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL2.11 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre. I : External Works Pricing Schedule I1 : Sewage Treatment Plant Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Pricing Schedule and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------------------- To Collection of Activity Xxxx I1 *** -------------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre. G : Terminus Building - E&M Works Lump Sum Breakdown G1 : ECS Lump Sum Item LSG1.2 G1.2 : Condensate Drains Contractor's other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". sum N/A N/A *** -------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSG1.2 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre. F : Terminus Building - ABWF Lump Sum Breakdown F2 : Station Trading Lump Sum Item LSF2.1 F2.1 : Station Trading - ABWF Emulsion paint; anti-fungal; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V544 soffit surfaces and lower surfaces inclined at an angle not exceeding 60 degrees to the horizontal m2 *** *** *** Synthetic paint; with one Coat recommended primer, two undercoats and one finishing coat; as Appendix AA to Particular Specification, section M60 Metal other than metal sections and pipework V915 isolated surfaces of width or girth not exceeding 500mm m2 *** *** *** Anti-dust sealer; with one coat polymer single component weather resistant top coat and one base coat; as Architectural Specification section 64.4 Concrete V934 soffit surfaces and lower surfaces inclined at an angle not exceeding 60 degrees to the horizontal m2 *** *** *** Cement and sand screed V991.1 upper surfaces inclined at an angle not exceeding 30 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF2.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre. F : Terminus Building - ABWF Lump Sum Breakdown F3 : Government Accommodation Lump Sum Item LSF3.1 F3.1 : Government Accommodation - ABWF Ancillaries (Cont'd)
LCC-300 Cost Centre. F : Terminus Building - ABWF Lump Sum Breakdown F7 : Roof Finishes Lump Sum Item LSF7.2 F7.2 : Immigration Roof Roofing; to type 1 roofing; as Appendix AA to Particular Specification, section J41 and Drawing nr LCC300/31/A31/101-103 (Cont'd) Sand and cement screed; fall 1 in 90; 25mm(min) thick W391.1 upper surface inclined at an angle not exceeding 30 degrees to the horizontal m2 *** *** *** 50mm thick extruded rigid polystyrene insulation board W391.2 upper surface inclined at an angle not exceeding 30 degrees to the horizontal m2 *** *** *** Protective layers; to type 1 roofing; as Appendix AA to Particular Specification, section J41 and Drawing nr LCC300/31/A31/101-103 Sand and cement screed; 25mm (min) thick W441 upper surface inclined at an angle not exceeding 30 degrees to the horizontal m2 *** *** *** ROOF TILING AND METAL ROOF CLADDING Roof tiling Precast reinforced concrete tiles; to BS 368; to the Engineer's review; size 200 x 200 x 50mm thick AA111 upper surface inclined at an angle not exceeding 30 degrees to the horizontal m2 *** *** *** SPECIALIST ARCHITECTURAL METAL WORK Metal access panel doors AH100 Access hatch cover; galvanised iron; approximate 900 x 900mm; including base frame; latch; tongue and associate ironmongery; as Drawing nr LCC302/31/A24/403 nr *** *** *** ------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF7.2 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]