Thermal Loadings Sample Clauses

Thermal Loadings. Equal to or greater than 10 MW on the most limiting monitored element under the most critical contingency that is causing the need for transmission improvements.
AutoNDA by SimpleDocs

Related to Thermal Loadings

  • Casual Loading (e) Superannuation contributions are to be made for periods when Employees are on:

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Containers The marine and intermodal cargo containers either owned or leased by the Borrower and employed by the Borrower in the conduct of its business, including, without limitation, refrigerated, dry van, tank, open top and flat rack containers and refrigeration units and generator sets associated therewith, but excluding any chassis for such containers.

  • Receipt Points The Points of Receipt are listed in Appendix 2.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.