Test Equipment and Procedure Correlation Sample Clauses

Test Equipment and Procedure Correlation. The test equipment and procedures used in the VENDOR's final inspection and test, will correlate with the test equipment and procedures used by GTECH. If correlation is not achieved within 30 calendar days prior to the first production shipment, the VENDOR agrees to obtain additional test equipment and/or develop procedures that are capable of correlation. Said test equipment and procedures will be mutually agreed upon by both the VENDOR and GTECH Purchasing, QA and Test Engineering.
AutoNDA by SimpleDocs
Test Equipment and Procedure Correlation. The test equipment and procedures used in the vendor's final inspection and test, will correlate with the test equipment and procedures used by GTECH; if correlation is not achieved within 30 days after notification of non correlation by GTECH, the vendor agrees to obtain additional test equipment and/or develop procedures at no cost to GTECH which are capable of correlation. Said test equipment and procedures will be mutually agreed upon by both the vendor and GTECH Test Engineering, Procurement Quality and Purchasing. GTECH remains responsible for all supplied software and VENDOR is responsible for implementing the updated software supplied by GTECH. [*Confidential Treatment Requested]
Test Equipment and Procedure Correlation. The test equipment and procedures used in the VENDOR's final inspection and test, will correlate with the test equipment and procedures used by GTECH upon mutual agreement between VENDOR and GTECH.

Related to Test Equipment and Procedure Correlation

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Test equipment For the tests an inertia dynamometer shall be equipped with the vehicle brake in question. The dynamometer shall be instrumented for continuous recording of rotational speed, brake torque, pressure in the brake line, number of rotations after brake application, braking time and brake rotor temperature.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Ownership Title to Project Deliverables This clause shall apply where Contractor is commissioned by the Authorized User to furnish project deliverables as detailed in the Purchase Order.

  • Loop Testing/Trouble Reporting 2.1.6.1 TeleConex will be responsible for testing and isolating troubles on the Loops. TeleConex must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, TeleConex will be required to provide the results of the TeleConex test which indicate a problem on the BellSouth provided Loop.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.

  • Conformity Assessment Procedures 1. The Parties recognise that a broad range of mechanisms exist to facilitate the acceptance of conformity assessment results, including:

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Periodic Review of Costs of Environmental Compliance In the ordinary course of its business, the Company conducts a periodic review of the effect of Environmental Laws on the business, operations and properties of the Company and its subsidiaries, in the course of which it identifies and evaluates associated costs and liabilities (including, without limitation, any capital or operating expenditures required for clean-up, closure of properties or compliance with Environmental Laws or any permit, license or approval, any related constraints on operating activities and any potential liabilities to third parties). On the basis of such review and the amount of its established reserves, the Company has reasonably concluded that such associated costs and liabilities would not, individually or in the aggregate, result in a Material Adverse Change.