Stormwater Budget Line Items & Funding Sample Clauses

Stormwater Budget Line Items & Funding. The dues of the Association shall include amounts for upkeep and reconstruction of the Facilities which shall be included in dues charged to Lots or members from the point that Lots or members are charged dues for other common purposes. The Association shall maintain two (2) separate funds in its budget for the Facility/ies. The first, the “Inspection and Maintenance Fund,” shall be for routine inspection and maintenance expenditures and shall be used for annual inspections, maintenance, and minor repairs. The funds for this purpose may be maintained as part of the Association’s general account. The second fund, the “Major Reconstruction Fund,” shall be a separate, increasing reserve fund that will build over time and provide money for major repairs to and eventual reconstruction of the Facility/ies. The Major Reconstruction Fund shall be maintained in an account that is separate account from the Association’s general account as described below. At a minimum, the Association shall, annually, earmark from its collected dues for the Inspection and Maintenance Fund and for the Major Reconstruction Fund. These minimum amounts shall be increased annually by 3% per year over the prior year’s amount. The Association may set a higher amount in its discretion, or if directed by Durham Director of Public Works after an examination of the Facility/ies. The Association shall set dues at a sufficient amount to fund each of the two line items in addition to the Association’s other obligations. The Association may compel payment of dues through all remedies provided in these Covenants or otherwise available under law.
AutoNDA by SimpleDocs

Related to Stormwater Budget Line Items & Funding

  • Enhancement Budget Enhancements refer to additional functionality and deliverables unknown to the Authorized User at the time of Mini-Bid release. An Authorized User is permitted to include an enhancement budget, as included in the Mini-Bid (up to 10%). The total cost of the project including the enhancement budget shall not exceed the Lot threshold from which the award was made. An Authorized User shall use Appendix F, Attachment 3, Enhancement Request Template to reflect such modifications. Mini-Bid/Statement of Work documents will define specific criteria and method of reimbursement for the enhancement budget. Written approval of the Enhancement Budget Request is required from both the Authorized User and the Contractor.

  • Project Funding 8.1 The Project Funding for completion of this PFA is as follows:

  • Construction Cost Budget The total cost to District of all elements of the Project designed or specified by the Architect, as adjusted during and at the end of the design phase in accordance with this Agreement and the Agreement for Architectural Services. The Construction Cost Budget does not include the compensation of the Project Design Team, the Program Manager (if any), the Construction Manager and any subconsultants, the cost of the land, rights-of-way, or financing which are the responsibility of the District.

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.

  • Construction Funding Subsidies 5.1 Subject to 5.2 and 5.3 the HSP is required to continue to fulfill all CFS Commitments, and the CFS Commitments are hereby incorporated into and deemed part of the Agreement.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Project Budget A Project Budget shall be prepared and maintained by Grantee. The Project Budget shall detail all costs for which the Grant will be used during each calendar month of the Term. The Project Budget must be approved in writing by the Project Monitor. Grantee shall carry out the Project and shall incur costs and make disbursements of funds provided hereunder by the Sponsor only in conformity with the Project Budget. The current approved Project Budget is contained in Attachment B. Said Project Budget may be revised from time to time, but no Project Budget or revision thereof shall be effective unless and until the same is approved in writing by Project Monitor. The funds granted under this Grant Contract cannot be used to supplant (replace) other existing funds.

  • Construction Manager’s Fee The following shall be deemed included in the Construction Manager’s fee for services during the Construction Phase.

  • Administrative Cost Recovery 3.1 In order to assist in the defrayment of the costs of administration and other expenses incurred by the Bank under this Agreement, the Bank may, following deposit of Contribution funds, deduct from such funds and retain for the Bank’s own account an amount equal to five percent (5.0%) of the Contributions.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

Time is Money Join Law Insider Premium to draft better contracts faster.