SEDIMENT BARRIERS – SILT FENCE Sample Clauses

SEDIMENT BARRIERS – SILT FENCE. These items shall be carried out in accordance with the Department’s Standard Specification, Division 7, Section 1 – Sediment Barriers Silt Fence, except as modified below. Silt Fence Type 1 will be used as a perimeter control to prevent the release of sediment-laden runoff, resulting from grubbing and grading work, to any watercourse or wetland. Silt fence will be erected along the down gradient perimeter of grubbing or embankments (where bare soil will be exposed) prior to the commencement of any grubbing or infilling. Where silt fence is installed on a gradient, the fence shall be broken into segments not to exceed 40 m in length with a “J-hook” configuration on the down gradient end of each segment to create a minimum pond area of 6 m2. Measurement for Type 1 Silt Fence will be by the linear metre of barrier installed, from end to end, following the slope of the ground. Payment for Sediment Barriers – Silt Fence will be at the contract unit price per linear metre, which price shall be full compensation for all trenching and noted items and incidentals required to complete the work as described herein to the satisfaction of the Engineer.
AutoNDA by SimpleDocs

Related to SEDIMENT BARRIERS – SILT FENCE

  • Porcupine Site Highway 11

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Dangerous Goods, Special Wastes, Pesticides and Harmful Substances Where employees are required to work with or are exposed to any dangerous good, special waste, pesticide or harmful substance, the Employer shall ensure that the employees are adequately trained in the identification, safe handling, use, storage, and/or disposal of same.

  • Workplace Violence Prevention A. In order to provide a safe and healthy workplace for employees, the State agrees to develop and implement "Workplace Violence Prevention" policies and programs.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.