Reports of unusualoccurrence. The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include:
AutoNDA by SimpleDocs
Reports of unusualoccurrence. The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include: (a) accident, death or severe injury to anyperson; (b) damaged or dislodged fixedequipment; (c) flooding of Project Highway;and (d) any other unusualoccurrence. Contract AgreementPage 98 of 154 “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Xxxxxxxxx Pt.-I Village in the State of Assam on EPC Mode under Xxxxxxxxxx Xxxxxxxxxx in Economic Corridors (Project Length – 11.8 km)” (4th Call) Mar 2023 Article 16 Traffic Regulation 16.1 Traffic regulation by theContractor (i) The Contractor shall take all the required measures and make arrangements for the safety of Users during the Construction and Maintenance of the Project Highway or a Section thereof in accordance with the provisions of MORTH Specifications. It shall provide, erect and maintain all such barricades, signs, markings, flags, and lights as may be required by Good Industry Practice for the safety of the traffic passing through the Section under construction ormaintenance. (ii) All works shall be carried out in a manner creating least interferenceto traffic passing through the Project Highway or a Section thereof. In sections where construction or maintenance Works on the carriageway are taken up, the Contractor shall ensure that proper passage is provided for the traffic. Where it is not possible or safe to allow traffic on part width of the carriageway, a temporary diversion of proper specifications shall be constructed by the Contractor at its own cost. ‘ROBOTS’ may be used for diversion and control of traffic during Construction. The Contractor shall take prior approval of the Authority’s Engineer for any proposed arrangement for traffic regulation during Construction and Maintenance, which approval shall not be unreasonablywithheld. Contract AgreementPage 99 of 154
Reports of unusualoccurrence. The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include: (a) accident, death or severe injury to anyperson; (b) damaged or dislodged fixedequipment; (c) flooding of Project Highway;and (d) any other unusualoccurrence. Contract AgreementPage 92 of 146 “Construction of 2-lane Ukhrul bypass starting at km 537.850 of NH-202 & joining at km 8.840 of NH-102A (Ukhrul – Toloi – Tadubi Road) and continuing upto km 9.840 of NH- 102A (Package-1, Length-6.571 km) in the State of Manipur on EPC mode. (2nd Call)” Feb 2024 Article 16
Reports of unusualoccurrence. The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include: (a) accident, death or severe injury to anyperson; (b) damaged or dislodged fixedequipment; (c) flooding of Project Highway;and (d) any other unusualoccurrence. Contract AgreementPage 96 of 152 “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Xxxxxxxxx Pt.-I Village in the State of Assam on EPC Mode under Xxxxxxxxxx Xxxxxxxxxx in Economic Corridors (Project Length – 11.8 km)” (2nd Call) Feb 2023 Article 16
Reports of unusualoccurrence. The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include: (a) accident, death or severe injury to anyperson; (b) damaged or dislodged fixedequipment; (c) flooding of Project Highway;and (d) any other unusualoccurrence. Contract AgreementPage 97 of 153 “Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA - ODA loan assistance.” Mar 2022 Article 16

Related to Reports of unusualoccurrence

  • Reports of unusual occurrence The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include:

  • Reports of Accidents Within 24 hours after Engineer becomes aware of the occurrence of any accident or other event which results in, or might result in, injury to the person or property of any third person (other than an employee of the Engineer), whether or not it results from or involves any action or failure to act by the Engineer or any employee or agent of the Engineer and which arises in any manner from the performance of this Contract, the Engineer shall send a written report of such accident or other event to the County, setting forth a full and concise statement of the facts pertaining thereto. The Engineer shall also immediately send the County a copy of any summons, subpoena, notice, or other documents served upon the Engineer, its agents, employees, or representatives, or received by it or them, in connection with any matter before any court arising in any manner from the Engineer’s performance of work under this Contract.

  • Failure to Maintain Financial Viability The System Agency may terminate the Contract if, in its sole discretion, the System Agency has a good faith belief that Grantee no longer maintains the financial viability required to complete the services and Deliverables, or otherwise fully perform its responsibilities under the Contract.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Unusual Job Requirements of Short Duration ‌ The nature of health care is such that at times it may be necessary for an employee to perform work not normally required in his/her job for the safety, health or comfort of a client or resident. It is understood that an employee shall not be expected to perform a task for which he/she is not adequately trained.

  • Project Monitoring Reporting Evaluation 1. The Project Implementing Entity shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08(b) of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than eight (8) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

  • Certification Regarding Debarment, Suspension, and Other Responsibility Matters – Primary Covered Transactions The Firm certifies to the best of its knowledge and belief, that it and its principals: