RAILROAD GRADE CROSSING Sample Clauses

RAILROAD GRADE CROSSING. (7-1-95) (Rev. 1-15-13) 107-9 SP1 G17R Provide at least 2 weeks advance notice to the railroad's local Roadmaster or Track Supervisor when the use of slow-moving or stopped equipment is required over at-grade railroad crossings.
AutoNDA by SimpleDocs
RAILROAD GRADE CROSSING. (7-1-95) (Rev. 10-20-20) 107-9 SP1 G17R When the use of slow moving or stopped equipment is required over at-grade railroad crossings, the contractor shall contact the appropriate track owner to gain Right of Entry. The contractor shall be responsible for ascertaining and contacting the railroad track owner. No separate payment will be made for conforming with the requirements of this Special Provision. Please contact the Resident Engineer or the Surfaces and Encroachment manager with the Rail Division with any questions pertaining to the Right of Entry at 000-000-0000 or xxxxxxx@xxxxx.xxx.
RAILROAD GRADE CROSSING. (7-1-95) (Rev. 1-17-13) 107-9 SP1 G 17R Provide at least 2 weeks advance notice to the railroad's local Roadmaster or Track Supervisor when the use of slow-moving or stopped equipment is required over at-grade railroad crossings. MAPS #2, #3 & #6 MAJOR CONTRACT ITEMS: (2-19-02) 104 SP1 G28 The following listed items are the major contract items for this contract (see Article 104-5 of the 2012 Standard Specifications): Line # Description
RAILROAD GRADE CROSSING. (7-1-95) (Rev. 1-17-13) 107-9 SP1 G 17R Provide at least 2 weeks advance notice to the railroad's local Roadmaster or Track Supervisor when the use of slow-moving or stopped equipment is required over at-grade railroad crossings. MAPS #6, #9 thru #11 MAJOR CONTRACT ITEMS: (2-19-02) 104 SP1 G28 The following listed items are the major contract items for this contract (see Article 104-5 of the 2018 Standard Specifications): Line # Description 7 — Asphalt Concrete Surface Course, Type S9.5 B 11 — Latex Modified Microsurfacing, Type II
RAILROAD GRADE CROSSING. (7-1-95) (Rev. 1-15-13) 107-9 SP1 G17R Provide at least 2 weeks advance notice to the railroad's local Roadmaster or Track Supervisor when the use of slow-moving or stopped equipment is required over at-grade railroad crossings. MAJOR CONTRACT ITEMS: (2-19-02) 104 SP1 G28 The following listed items are the major contract items for this contract (see Article 104-5 of the 2012 Standard Specifications): Line # Description 4 Portland Cement for Soil Cement Base 11 Asphalt Concrete Surface Course, Type S9.5B 14 Asphalt Concrete Surface Course, Type SF9.5A

Related to RAILROAD GRADE CROSSING

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Food and Beverage All food and beverages (alcoholic and non alcoholic) which are located at the Hotel (whether opened or unopened), or ordered for future use at the Hotel as of the Closing, including, without limitation, all food and beverages located in the guest rooms, but expressly excluding any alcoholic beverages to the extent the sale or transfer of the same is not permitted under Applicable Law (the “F&B”);

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Federal Medicaid System Security Requirements Compliance Party shall provide a security plan, risk assessment, and security controls review document within three months of the start date of this Agreement (and update it annually thereafter) in order to support audit compliance with 45 CFR 95.621 subpart F, ADP System Security Requirements and Review Process.

  • Food and Beverages No food or beverage may be brought onto the Ship without City Cruises’ prior authorization, granted in City Cruises’ sole discretion. No food or beverage may be removed from the Ship.

  • Customer Satisfaction 4.1 Services to be provided under Call Off Agreements to the satisfaction of Contracting Bodies 90% Confirmation by the Authority of the Supplier’s performance against customer satisfaction surveys

  • Level 3 If the grievant is not satisfied with the written answer from the appointing authority, the grievant may, within ten (10) days of such answer, file a written appeal to the Director of Human Resources. Within ten (10) days of receipt of the written appeal, the Director of Human Resources or his/her designee shall investigate the grievance, which shall include a meeting with the concerned parties, unless such meeting is waived by mutual agreement of the parties, and thereafter shall give a written answer to the grievant within ten (10) days, which answer shall be final and binding unless appealed by the Association.

Time is Money Join Law Insider Premium to draft better contracts faster.