Proposed System Architecture Sample Clauses

Proposed System Architecture. For the near-term, the AutoCAD data store will be maintained till all the Utility departments are ready to fully embrace the ArcGIS platform and existing custom CAD based Once an ArcGIS platform is fully implemented as shown in the proposed system architecture diagram, data will be synchronized between CAD and Esri data stores using FME ETLs. The City would like to deploy a client-server based GIS architecture that is centered on the geodatabase and ArcGIS Server. This is illustrated by the graphic included on the side where a centrally managed system houses all GIS data and applications. In turn, data and applications specific to the needs of each department will be made available to the end users through various applications and methods. The existence and maintenance of a centrally-located enterprise geodatabase(s) is the cornerstone component in the City’s new enterprise GIS program. The geodatabase will be accessed directly through multiple desktop GIS applications, as well as various Esri ArcGIS Services. The City would also like to adopt Esri Local Government Information Model (LGIM) as much as possible. The City’s Utility department desires to adopt Esri’s Utility Network Model as much as possible as well after a feasibility study is done and a transition plan is put in place. Certificate Of Completion Envelope Id: 9F0ED09956AD4C62BD56D29D3DA7DCA8 Status: Completed Subject: Please DocuSign: XXXXXXX XXXXX INC C20174611F - Legal reviewed.pdf Source Envelope: Document Pages: 43 Signatures: 2 Envelope Originator: Certificate Pages: 2 Initials: 0 Xxxxx Xxx AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 000 Xxxxxxxx Xxx Palo Alto , CA 94301 Xxxxx.Xxx@XxxxxxXxxxXxxx.xxx IP Address: 199.33.32.254 Record Tracking Status: Original 3/24/2020 2:40:05 PM Holder: Xxxxx Xxx Xxxxx.Xxx@XxxxxxXxxxXxxx.xxx Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign Signer Events Signature Timestamp Xxxxxxx Xxxx XXXXX@xxxxxxxxxx.xxx Vice President Xxxxxxx Xxxxx International Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 68.4.173.93 Sent: 3/24/2020 2:44:35 PM Viewed: 3/24/2020 4:14:51 PM Signed: 3/24/2020 4:15:13 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Xxxxxxx Xxxxxx xxxxxxx@xxxxxxxxxx.xxx Security Level: Email, Account Authentication (N...
AutoNDA by SimpleDocs
Proposed System Architecture. In Our Proposed System Our used Stored-SIM or storage planning and provide some security to user data, in that we use two layer protections such as LM Layer and CM layer all work is used in different layer. In our application de- duplication Layer and Chunking are performed in data in LM Layer and encryption and Bundling is performed in Data in CM Layer. Also we focus on access control, for the purpose for avoiding information leakage by using dynamic grouping concept’s point of view also we give record monitoring to avoiding the attacker we use block chinning concept. In this project researcher used Bloom-filter Sketch for Min Hash,Generating Storage Plan Based on clustering,Idea encryption algorithms.

Related to Proposed System Architecture

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Design At no cost to SCE, Seller shall be responsible for:

  • Technical Specifications 1. A procuring entity shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with the purpose or effect of creating an unnecessary obstacle to trade between the Parties.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

Time is Money Join Law Insider Premium to draft better contracts faster.