PLACING TOPSOIL Sample Clauses

PLACING TOPSOIL. A. Spread topsoil to a minimum depth of 2 inches over area to be sodded.
AutoNDA by SimpleDocs
PLACING TOPSOIL. A. Place topsoil in areas where seeding and re-planting by others is required to nominal depth of 6 inches. Place topsoil during dry weather.
PLACING TOPSOIL. A. Certain grading requirements for establishing the subgrade for restored areas are specified and included herein under sections as listed in paragraph 1.01 above; these requirements include all cutting, filling, backfilling, embankments and grading necessary to bring the subgrade of all grassed areas to a depth of not less than four (4") inches below the proposed finished grades as indicated and/or as directed by the Owner.

Related to PLACING TOPSOIL

  • Load Shedding The Distributor may carry out Load Shedding in the following circumstances:

  • Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.

  • Lunch Break Each Teacher shall receive each day an uninterrupted and continuous period of not less than forty (40) minutes for lunch, free from supervisory, teaching or other assigned duties (reference: Regulation 298.s. 3, Daily Sessions).

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: IS sieve Designation Percentage Passing by weight for graded aggregate of nominal size. 40mm 20mm 16mm 12.5mm 63mm 100 - - - 40mm 00-000 000 - - 20mm 00-00 00-000 100 - 16mm - - 00-000 000 12.5 - - - 90-100 10.00 00-00 00-00 00-00 00-00 4.75mm 0-5 0-10 0-10 0-10

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Windows a. Front and rear windshield per California Vehicle Code § 26710.

  • STAGE The aggrieved may within twenty-one (21) calendar days after an occurrence, or in the case of disciplinary action within twenty-one (21) calendar days after same has been brought to the attention of the reduce the grievance to writing and accompanied by representatives of the Grievance Committee, take the matter up with the Fire Chief. The Fire Chief shall, within seven (7) calendar days, arrange a meeting place and time to discuss and attempt to settle the grievance. The Corporation will be represented at this stage of the grievance procedure by the Fire Chief and the Director of Human Resources. Grievancesthat are not settled within seven (7)calendar days of the meeting may be referred to Stage provided that not more than seven (7) calendar days have elapsed since the meeting at Stage STAGE2 The aggrieved shall reconsider the grievance and the Fire Chief's response at Stage and decide within five (5) calendar days whether to proceed with the grievance. If the aggrieved wishes to proceed, the Assistant City Manager of Emergency and Corporate Services, the Fire Chief, and the Director of Human Resources will meet with the aggrieved accompanied by representatives of the Grievance Committee within seven (7) calendar days of notification by the aggrieved Failing settlement at this stage, Stage of the grievance procedure may be invoked provided that no more than seven (7) calendar days have elapsed since the hearing at Stage STAGE The aggrieved accompanied by representatives of the Grievance Committee, may then take the written grievance to a committee of Council members. In the case of discharge, the grievance shall be heard by the entire Council. Failing settlement at this stage within fourteen (14) calendar days, then the grievance may be referredto Arbitration, as provided under the "Fire Protectionand Prevention Act Part as amended, provided that not more than thirty

  • Lunch Breaks The lunch break will consist of a one-half hour (or one hour where scheduled) unpaid break taken mid-way during regular work day. In the event that an employee is required to work during his regular lunch period he shall be allowed a one-half hour lunch period between the hours of ll:30 a.m. and l:00 p.m., otherwise he shall be paid double time for working through said lunch period.

  • MOLD AND MILDEW Resident acknowledges that it is necessary for Resident to provide appropriate climate control, keep the Apartment clean, and take other measures to retard and prevent mold and mildew from accumulating in the Apartment. Resident agrees to clean and dust the Apartment on a regular basis and to remove visible moisture accumulation on windows, walls and other surfaces as soon as reasonably possible. Resident further agrees not to block or cover any of the heating, ventilation or air-conditioning ducts in the Unit. Resident agrees to immediately report to the management office: (i) any evidence of a water leak or excessive moisture in the Apartment, as well as in any storage room, garage or other common area; (ii) any evidence of mold- or mildew-like growth that cannot be removed by simply applying a common household cleaner and wiping the area; (iii) any failure or malfunction in the heating, ventilation, air conditioning systems or laundry systems in the Apartment; and (iv) any inoperable doors or windows. Resident further agrees that Resident shall be responsible for damage to the Premises and Resident’s property as well as injury to Resident, Authorized Occupants, Resident’s family member(s), and guests resulting from Resident’s failure to comply with the terms of this Section.

Time is Money Join Law Insider Premium to draft better contracts faster.