Metallic layer Sample Clauses

Metallic layer. Where the cable core screen shall in adequate to meet the earth fault current specified, for single core cable the geometrical cross – sectional area of metallic layer screen shall be not less than 36 mm², a metallic layer of adequate cross – sectional area shall be included in the design either laid- up with the main cores or applied over the screen. The metallic layer shall be constructed of annealed high – conductivity copper in accordance with IEC publication 60502. Adding a semi- conductive water blocking tape below and above copper wire screening which can protect outer semi-conductive layer from moisture and mechanical damage during installation
AutoNDA by SimpleDocs
Metallic layer. Where the cable core screen shall in adequate to meet the earth fault current specified, for three core cable the total geometrical cross – sectional area of metallic layer screen shall be not less than 50 mm2 to be suitable for earth fault current, after assembly where in the assembly the metallic layer on each phase shall be touch each other, a metallic layer of adequate cross – sectional area shall be included in the design either laid- up with the main cores or applied over the screen. The metallic layer shall be constructed of annealed high – conductivity copper in accordance with IEC publication 60502. The earth fault current is 3KA/3 sec for 33 KV systems.
Metallic layer. Where the cable core screen shall in adequate to meet the earth fault current specified, for three core cable the total geometrical cross – sectional area of metallic layer screen shall be not less than 50 mm2, after assembly where in the assembly the metallic layer on each phase shall be touch each other, for single core cable the geometrical cross – sectional area of metallic layer screen shall be not less than 36 mm², a metallic layer of adequate cross – sectional area shall be included in the design either laid- up with the main cores or applied over the screen. The metallic layer shall be constructed of annealed high – conductivity copper in accordance with IEC publication 60502.

Related to Metallic layer

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • Smoke Detectors At Owner's expense, smoke detectors will be installed on the Property in working condition in accordance with the law prior to the tenant's occupancy. During the occupancy, it shall be the tenant's responsibility to maintain all smoke detectors. Owner will replace smoke detector equipment as needed.

  • Cell Phones The College follows the State’s Cell Phone Policy. Employees who receive cell phones from the College shall also abide by this Policy. The College shall provide the Policy to any employee who is given a cell phone. Employees are responsible for the cost of all personal calls. While the College anticipates some incidental personal use of cell phones, it is also expected that such use is infrequent.

  • Scaling “Scaling,” as used herein, involves:

  • Vlastnictví Zdravotnické zařízení si ponechá a bude uchovávat Zdravotní záznamy. Zdravotnické zařízení a Zkoušející převedou na Zadavatele veškerá svá práva, nároky a tituly, včetně práv duševního vlastnictví k Důvěrným informacím (ve smyslu níže uvedeném) a k jakýmkoli jiným Studijním datům a údajům.

  • Video Display Terminals ‌ The Employer shall ensure that any new office equipment or facility required for use in conjunction with VDTs shall meet the standards recommended by the Workers' Compensation Board.

  • Games The Private Party shall not be entitled to introduce any arcade type amusement or gaming machines into the Restaurant Facility without the prior written approval of SANParks.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • VOETSTOOTS The PROPERTY is sold:

Time is Money Join Law Insider Premium to draft better contracts faster.