Inspection Methodology Sample Clauses

Inspection Methodology. PDI (Pre-Dispatch Inspection) as mentioned in Annexure-I means, the QA inspection/testing shall be completed prior dispatch of supplies direct to consignees/CMSS warehouses. After completion of manufacturing process, the supplier should offer goods for PDI inspection in writing to Quality Assurance department of CMSS at least 10 days before proposed inspection date. The samples of each batch will be collected and sent to designated laboratories (Government/ Private Drugs Testing Laboratories) for testing as decided by the CMSS. Sample quantities will be borne by the supplier. However, handling and testing charges will be borne by CMSS. After the dispatch clearance of Quality Assurance department of CMSS, the supplier will deliver the items to the consignee or CMSS warehouses as per the schedule mentioned in the Purchase Order. If the supplier delivers/dispatches goods without completing the QA inspection, sample testing, dispatch clearance etc., CMSS shall not be processing the payments of such goods and the supplier will be solemnly responsible for the supply of such goods. Non-PDI (Post Delivery Inspection) as mentioned in Annexure-I means, the supplier will deliver/dispatch the manufactured items (as per the technical specifications) directly to CMSS warehouses. The samples will be collected from the warehouse of CMSS and sent to designate Quality Control Labs in respect of supplied goods at any point during specified shelf life as per decision of CMSS. Sample quantities will be borne by Purchaser. Also, handling and testing charges will be borne by Purchaser. In case of failure of batches during or at any stage (indicated at 16.5), the testing charges would be claimed for the defaulting vendor.
AutoNDA by SimpleDocs
Inspection Methodology. At pre-dispatch and/or delivery stage, samples of supplies in each batch will be chosen for testing. The samples will be collected and sent to designated laboratories (Government/ Private Drugs Testing Laboratories) for testing as decided by the CMSS. Handling and testing charges will be borne by CMSS. At post delivery surveillance - The samples will be collected from the warehouse of CMSS/or final consignee in States/UTS and sent to designated Quality Control Labs in respect of supplied goods at any point during specified shelf life as per decision of CMSS. In case of failure of batches during or at any stage (indicated at 16.3), the testing charges would be claimed for the defaulting vendor.
Inspection Methodology. 4.2 SNRC will inspect both independently and utilizing the information provided by the contractor in clause 4.1(c).
Inspection Methodology. 4.2 Chinook will inspect payment areas using the Ministry of Forests, Lands and Natural Resource Operations’ Planting Quality Inspection System available at xxxx://xxx.xxx.xxx.xx.xx/isb/forms/lib/FS704A.PDF, which the Contractor hereby acknowledges to have read and understood.
Inspection Methodology. 4.2 Silvicon will inspect payment areas using the Ministry of Forests, Lands and Natural Resource Operations’ Planting Quality Inspection System available at xxxx://xxx.xxx.xxx.xx.xx/isb/forms/lib/FS704A.PDF, which the Contractor hereby acknowledges to have read and understood.

Related to Inspection Methodology

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.

  • Methodology 1. The price at which the Assuming Institution sells or disposes of Qualified Financial Contracts will be deemed to be the fair market value of such contracts, if such sale or disposition occurs at prevailing market rates within a predefined timetable as agreed upon by the Assuming Institution and the Receiver.

  • Claims Review Methodology a. C laims Review Population. A description of the Population subject to the Quarterly Claims Review.‌

  • Service Providing Methodology 1.3.1 Party A and Party B agree that during the term of this Agreement, where necessary, Party B may enter into further service agreements with Party A or any other party designated by Party A, which shall provide the specific contents, manner, personnel, and fees for the specific services.

  • Loop Testing/Trouble Reporting 2.1.6.1 TeleConex will be responsible for testing and isolating troubles on the Loops. TeleConex must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, TeleConex will be required to provide the results of the TeleConex test which indicate a problem on the BellSouth provided Loop.

  • Conformity Assessment Procedures 1. The Parties recognise that a broad range of mechanisms exist to facilitate the acceptance of conformity assessment results, including:

  • Selection Procedures In selecting the Loan Assets to be Pledged pursuant to this Agreement, no selection procedures were employed which are intended to be adverse to the interests of the Lenders.

  • Selection of Architect/Construction Drawings Tenant shall retain the architect/space planner (the “Architect”) approved by Landlord, which approval shall not be unreasonably withheld, to prepare the Construction Drawings. Tenant shall retain the engineering consultants designated by Landlord (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing, HVAC, lifesafety, and sprinkler work in the Premises. The plans and drawings to be prepared by Architect and the Engineers hereunder shall be known collectively as the “Construction Drawings.” All Construction Drawings shall comply with the drawing format and specifications reasonably determined by Landlord, and shall be subject to Landlord’s approval. Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the base building plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord’s review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord’s space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings.

  • Underwriting Methodology The methodology used in underwriting the extension of credit for each Mortgage Loan employs objective mathematical principles which relate the related Mortgagor's income, assets and liabilities to the proposed payment and such underwriting methodology does not rely on the extent of the related Mortgagor's equity in the collateral as the principal determining factor in approving such credit extension. Such underwriting methodology confirmed that at the time of origination (application/approval) the related Mortgagor had a reasonable ability to make timely payments on the Mortgage Loan;

  • Evaluation Procedures 7.2.1 Evaluation procedures designed to fairly and adequately assess performance of full- time faculty employees shall be established and reviewed annually by the Vice President, after consultation with appropriate faculty groups at divisional/departmental meetings for their recommendations.