Construction methods, definition

Construction methods, for the purpose of Part Four, means all new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage.
Construction methods,. The Contractor shall remove the HMA material using means acceptable to the Engineer. The pavement surface shall be removed to the line, grade, and existing or typical cross-section shown on the plans or directed by the Engineer.

Examples of Construction methods, in a sentence

  • Construction methods and techniques used by the Contractor shall be in accordance with the recommended practices and procedures published by leading industry manufacturers and trade associations, such as Bellcore Blue Book of Construction Practices.

  • Construction methods, materials method of measurement, and basis of payment shall be as specified in Section 9.21 of Form 817.

  • Construction methods must be of such a nature that no person, property or improvements in the vicinity of the works is endangered.

  • Construction methods for the two associated infrastructures i.e. the cavern development and the road improvement works are also given below.

  • One requirement of a new construction activity is that all new homes must include Radon Resistant New Construction methods according to EPA regulation and will be subject to a clearance test by the City of Joplin or its contracted agent.

  • GT0068-00001 Construction methods and material used in and for construction shall be designed to account for the likely range of salinity and pollutants which may be dissolved in groundwater and shall not themselves cause pollution of the groundwater.

  • Construction methods shall include demolition of the existing north L-wall; excavation and shoring to support the existing soil following removal of the concrete lining and support of the existing south wall from sliding in general and in particular in the vicinity of the commercial building at Beach Boulevard; implementation of a construction dewatering system for year round flow diversion; concrete formwork, installation of reinforced steel, and placement of structural concrete.

  • Construction methods, interfaces, materials list, mass estimates, and cost and schedule estimates to fabricate and test a complete HIAD.

  • The Construction of the Project Improvements shall be conducted only by use of Construction methods and techniques that do not endanger the safe operation of the Public Improvements, as reasonably determined by Landlord, and do not endanger the safety of any Persons using, operating, or maintaining the Public Improvements, as reasonably determined by Landlord.

  • Construction methods and standards of finish must, except as otherwise specified in the Contract Documents, be in accordance with all relevant Australian Standards.