GUARANTEED FUEL AND GAS CONSUMPTION Sample Clauses

GUARANTEED FUEL AND GAS CONSUMPTION. The SELLER guarantees that the fuel oil consumption of the main engine shall not exceed tolerance of +6% as determined by the shop test to be SFOC 160.2 g/kWh at NCR (78.6%SMCR) running at Tier II mode as stipulated in the Specification (hereinafter called the “Guaranteed Fuel Consumption”). Shop test shall be based on diesel oil having a lower calorific value of 42,700kJ/kg at ISO standard reference condition. If the fuel oil used at shop test has a calorific value other than 42,700kJ/kg and/or the surrounding shop test condition is different from the above ISO standard condition, the fuel oil consumption [***] Shipbuilding Contract Hull No. 0120833 shall be adjusted accordingly based on the conversion formula issued by MAN B&W and shall be subject to a tolerance of +6%. The SELLER guarantees that the gas consumption of the main engine shall not exceed tolerance of +6% as determined by the shop test to be 129.1 g/kWh + Pilot Fuel with tolerance of +25% as 1.02 g/kWh at NCR (78.6%SMCR) running at Tier II mode as stipulated in the Specification (hereinafter called the “Guaranteed Gas Consumption”). Shop test shall be based on gas having a lower calorific value of 50,000kJ/kg at ISO standard reference condition. If the gas used at shop test has a calorific value other than 50,000kJ/kg and/or the surrounding shop test condition is different from the above ISO standard condition, the gas consumption shall be adjusted accordingly based on the conversion formula issued by MAN B&W and shall be subject to a tolerance of +6%.
AutoNDA by SimpleDocs

Related to GUARANTEED FUEL AND GAS CONSUMPTION

  • Fuel Upon redelivery of the Aircraft to Lessor, an adjustment will be made in respect of fuel on board on the Previous Delivery Date and the Expiry Date at the price then prevailing at the Redelivery Location.

  • Production Work Except as agreed to in writing by the Parties pursuant to the "Production Work" section of the Standard Online Commerce Terms & Conditions attached hereto as Exhibit F, MP will be responsible for all production work associated with the Affiliated MP Site, including all related costs and expenses.

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Transportation Reasonable transportation costs incurred in connection with the transportation of employees and material necessary for Operations.

  • Plant An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant Amendments.

  • Production Royalty The amount of the Royalty shall be determined at the end of each month after the Effective Date. The Royalty shall be determined monthly on the basis such that payments will be determined as of and paid within thirty (30) days after the last day of each month during which Lessee produces any Geothermal Resources. The Royalty rates shall be determined as follows:

  • Transportation Costs The cost of transporting a Warranted Part claimed to be defective to the facilities designated by the Seller and for the return therefrom of a repaired or replaced Warranted Part shall be borne by the Buyer.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Production All of the oil, natural gas, condensate, casinghead gas, products or other minerals, attributable or allocable to the Interests or Xxxxx (i) from and after the Effective Time or (ii) which are in storage above the pipeline connection as of the Effective Time, or (iii) with regard to any over-produced or under-produced volumes of Sellers attributable to the Assets (the “Hydrocarbons”).

  • Temperature The Committed Gas shall not have a temperature of less than forty degrees Fahrenheit (40°F) nor more than one hundred twenty degrees Fahrenheit (120°F).

Time is Money Join Law Insider Premium to draft better contracts faster.