Gravel Excavation Sample Clauses

Gravel Excavation. No commercial gravel sales will be permitted from pits within the HMA. Excavation of new gravel/ledge areas involves the potential removal of shelter stands to access the gravel. Area and cumulative percentage of CDWH and SDWH will decrease when excavation requires the reduction of deer winter habitat. When excavation is completed for a particular area, areas disturbed from excavation will be seeded with a non-invasive "wildlife mix" of grasses and herbaceous plants or planted to native tree seedlings suitable for the site. Existing gravel/ledge pits may exceed one acre in size; however, expansion of these larger gravel/ledge pits can only be made if an equivalent area of the pit is reclaimed and stabilized. Existing open gravel/ledge areas at the time of this Agreement are not considered potential habitat, and thus will not be used in calculating the percent area meeting CDWH and SDWH as explained in Section 2. The excavation guidelines are as follows: ♦ Each new gravel/ledge pit will be limited to 1 acre of working pit area; ♦ Expansion of grave/ledge pit excavation beyond 1 acre will be allowed after an equivalent area in the gravel/ledge pit has been reclaimed, stabilized, and revegetated; and ♦ Development of gravel/ledge pits in travel corridors will be avoided where possible.
AutoNDA by SimpleDocs

Related to Gravel Excavation

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • FABRICATION Making up data or results and recording or reporting them.

  • Porcupine Site Highway 11

  • WATERBEDS The Tenant: (check one) ☐ - Shall have the right to use a waterbed on the Premises. ☐ - Shall not have the right to use a waterbed on the Premises.

  • Inclement Weather 24.1 This Inclement Weather clause sets out the full rights, obligations and entitlements of the parties and establishes the conditions under which payment for periods of inclement weather shall be made.

  • Cheating Cheating is prohibited, and will result in immediate action and termination without compensation.

Time is Money Join Law Insider Premium to draft better contracts faster.