GOLD SHOVEL STANDARD Sample Clauses

GOLD SHOVEL STANDARD. If an Implementer’s Program includes Excavation (as defined below): Before performing any Services involving Excavation, Implementer must be certified by the Gold Shovel Standard, a nonprofit organization that provides independent safety certification and perfor- xxxxx measurement. As used in this section, the term “Excavation” has the meaning defined in Califor- nia Government Code Section 4216(g), which provides as follows: “’Excavation’ means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.”
AutoNDA by SimpleDocs

Related to GOLD SHOVEL STANDARD

  • Technical Standards The Generation System shall be installed and operated by the Interconnection Customer consistent with the requirements of this Agreement; the Technical Requirements; the applicable requirements located in the National Electrical Code (NEC); the applicable standards published by the American National Standards Institute (ANSI) and the Institute of Electrical and Electronic Engineers (IEEE); and local building and other applicable ordinances in effect at the time of the installation of the Generation System.

  • General standard Without prejudice to all other obligations of the parties under this contract, each party shall, in its dealings with the other for the purpose of, and in the course of performance of its obligations under, this contract, act with due efficiency and economy and in a timely manner with that degree of skill, diligence, prudence and foresight which should be exercised by a skilled and experienced:

  • Operational Standards Customer shall furnish, install, operate and maintain in good order and repair, all without cost to the City, all equipment required for the safe operation of the Facility in parallel with the City’s electric distribution system. This includes, but is not limited to, equipment necessary to:

  • Accounting System Requirement The Contractor shall maintain an adequate system of accounting and internal controls that meets Generally Accepted Accounting Principles or “GAAP.”

  • WORKLOAD STANDARDS One (1) Direct Service Hour (DSH) will be equal to sixty (60) minutes of direct services.

  • Service Level Standards In addition to all other requirements in this Agreement, and in accordance with the Best Claims Practices & Estimating Guidelines, Vendor shall use reasonable and good faith efforts to meet the Service Level Standards set forth below.

  • Meets Standard The school materially complies with applicable laws, rules, regulations and provisions of the charter contract relating to financial reporting requirements, including but not limited to: • Complete and on-time submission of financial reports, including annual budget, revised budgets (if applicable), periodic financial reports as required by the authorizer and any reporting requirements if the board contracts with an Education Service Provider (ESP) • On-time submission and completion of the annual independent audit and corrective action plans, if applicable • No charging of tuition • Adequate management and financial controls • All reporting requirements related to the use of public funds Measure 2b Is the school following Generally Accepted Accounting Principles (GAAP)?

  • Reliability Standard Seller agrees to abide by (i) CPUC General Order No. 167, “Enforcement of Maintenance and Operation Standards for Electric Generating Facilities”, and (ii) all applicable requirements regarding interconnection of the Project, including the requirements of the interconnected Participating Transmission Owner.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Requirement to Utilize HUB Compliance Reporting System Pursuant to Texas Administrative Code, Title 34, Part 1, Sections 20.285(f) and 20.287(b), TFC administers monthly administration HSP-PAR compliance monitoring through its HUB Compliance Reporting System commonly known as B2G. PSP and PSP’s subcontractors/subconsultants shall submit required PAR information into the B2G system. Any delay in the timely submission of PAR information into the B2G system will be treated as an invoicing error subject to dispute under Texas Government Code Section 2251.042.

Time is Money Join Law Insider Premium to draft better contracts faster.