General arrangement Sample Clauses

General arrangement. The Project will consist of a main gravity dam, in concrete across the Paraná River, with a powerhouse at its foot and of lateral rock-rill dams and earth xxxxx on each bank of the river. The lateral dam on the right bank will include the structure of the spillway, together with its gates. The general direction of the works will be east-west along a broken-line axis with a total development of
AutoNDA by SimpleDocs
General arrangement. 1. This is an Agreement between (“the department”) and (“Employee”) to establish the terms and conditions of an alternative work schedule.
General arrangement. The Project will consist of a main gravity dam, in concrete across the Paraná River, with a powerhouse at its foot and of lateral rock-rill dams and earth xxxxx on each bank of the river. The lateral dam on the right bank will include the structure of the spillway, together with its gates. The general direction of the works will be east-west along a broken-line axis with a total development of 8.5 kilometres. The normal maximum water level in the reservoir was established at about 220 metres above sea level. The reservoir will flood an area of approximately 1,400 km2 (800 km2 in Brazil and 600 km2 in Paraguay) and will extend approximately 200 kilometres upstream up to and including the Salto Grande de Sete Quedas, or Salto del Guairá.
General arrangement. 2.1. The Tenant rents the Villa for short-term leisure stay. The Villa as a place to rent consists of the residential floors only, the cellar and the attic are private and reserved for the Landlord, as they serve as maintenance areas. This lease includes the use of the sitting area, parking spaces and a storage shed for storing bicycles and other sports equipment.
General arrangement. The general arrangement for the raw material warehouse is shown in the project drawings. -------------------------------------------------------------------------------- EXHIBIT 1 - SCOPE OF WORK
General arrangement. The general arrangement for the recycled fiber plant is shown in the project drawings. Most of the main process equipment is housed in a single building adjacent to part of the raw material warehouse and in line with the paper machine building. Some equipment is located on structural steel mezzanines within this single building. The main HD stock chests are located to the north and in between the main recycled fiber plant building, and the raw material receiving building. The two *** clarifiers are located in a structure northwest of the main building. The area below the thickener structure is also enclosed to provide protection for some small tanks and pumps. A rain roof is over the structures. The electrical substations and switchgear are located in a fenced, graveled area northwest of the main recycled fiber plant building. Two pulper conveyors will bring recycled fiber into the pulpers from the raw material warehouse. Rejects will be transferred to compactors on the east side of the building.
General arrangement. The general arrangement for the paper machine area is shown in the project drawings referenced in Exhibit 5 of this Agreement For Engineering, Procurement And Construction. Most of the main process equipment is housed in a single paper machine building. The "basement" level will be slightly above grade level. An operating floor will be approximately 20 ft. above the basement level. A mezzanine will be located along the drive side of the paper machine to support -------------------------------------------------------------------------------- EXHIBIT 1 - SCOPE OF WORK -------------------------------------------------------------------------------- air handling equipment. The building height will be about 63 ft. in the paper machine area and 39 ft. in the stock preparation area. The white water and broke tanks are located north of the main building. An extension of the paper machine building on the wet end drive side will house the vacuum pumps. Another extension of the paper machine building on the drive side will house the transformers and switchgear at grade level and the electrical and rack rooms at operating floor level. The saveall mezzanine will be extended west to house the wet end control room.
AutoNDA by SimpleDocs
General arrangement. EXHIBIT 1 - SCOPE OF WORK -------------------------------------------------------------------------------- The general arrangement for the roll storage warehouse is shown in the project drawings.
General arrangement. The general arrangement for the boiler and utility area is shown in drawings referenced in Exhibit 5 of this Agreement. Most of the equipment is located at grade level in a building adjacent to the drive side of the paper machine building. The deaerator tank is supported on a mezzanine level within the boiler building. The oil storage tank is located near the perimeter road. A pipe bridge connects the tank area with the utility building.
General arrangement. The effluent treatment area layout is shown in the project drawings. It occupies an area of 324 feet by 355 feet. The size and layout can be modified to fit constraints of the site when it is selected. Major items include: . *** gallon concrete influent sump tank . *** ft diameter primary clarifier . *** gallon cooling tank. . *** ft diameter sequencing batch reactors . *** gallon SBR equalization tank. . gravity filter . *** gallon sludge chest . two sludge presses with conveyors . sludge dewatering building.
Time is Money Join Law Insider Premium to draft better contracts faster.