FEDERICA architectural principles Sample Clauses

FEDERICA architectural principles. An extensive review, done by the JRA2 partners, on existing and planned architectural frameworks, concepts, project plans, and implementations related to FEDERICA has been reported in DJRA2.1. The review resulted in a set of requirements which were considered during the FEDERICA architectural design. The main design principles were: • Versatile, so as to accept different types of technology • Distributed • Be part of the Internet, in order to provide a realistic environment and the possibility to test the migration path from the current technologies to the new ones • Capable of federating with other facilities, to offer a richer environment to its users • Offer the capability to ensure reproducibility behaviour of its elements • Offer full control and configuration capability • Encompass all the network layers, including applications • Pose the minimum number of constraints to its users The subsequent application of these principles during the FEDERICA architectural design and the implementation of the infrastructure ensured that the FEDERICA infrastructure became unique, in the sense that it differs from similar virtualisation capable infrastructures of today. Taking the FEDERICA principles into account, we can say that the well-known and widely used PlanetLab [Pan] did not provide full reproducibility, since it is deployed on a ´best effort´ platform which is the public Internet. The most important limitation of the OneLab/PlanetLab architecture is that the underlying transport network layer is not part of PlanetLab and this lack of control may result in under provisioning and affect experiments. In FEDERICA, a ‘real network substrate’ has been created together with some engineering methods ensuring the reproducibility of the experiments. Even in Emulab [Emu] the network is a fake, although the experiments can virtually be scaled very well. The current implementation of VINI is based on PlanetLab [Vin]. PL-VINI allows real routing protocols to run on a virtual network topology that is implemented as an overlay on PlanetLab. This feature is also part of the FEDERICA concept allowing research on Layer 3; however, the scope of FEDERICA has also been extended to the lower layers (i.e. raw Ethernet).
AutoNDA by SimpleDocs

Related to FEDERICA architectural principles

  • General Principles 9.2.1 Each Party shall implement its tasks in accordance with the Consortium Plan and shall bear sole responsibility for ensuring that its acts within the Project do not knowingly infringe third party property rights.

  • Cost Principles The Subrecipient shall administer its program in conformance with 2 CFR Part 200, et al; (and if Subrecipient is a governmental or quasi-governmental agency, the applicable sections of 24 CFR 85, “Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments,”) as applicable. These principles shall be applied for all costs incurred whether charged on a direct or indirect basis.

  • Basic Principles The Electrical Contractor and the Union have a common and sympathetic interest in the Electrical Industry. Therefore, a working system and harmonious relations are necessary to improve the relationship between the Employer, the Union and the Public. Progress in industry demands a mutuality of confidence between the Employer and the Union. All will benefit by continuous peace and by adjusting any differences by rational common-sense methods.

  • Principles of cooperation The Parties shall apply the following principles to cooperation activities covered by this Agreement:

  • General Principle (a) Each Employer recognises that Employees sometimes face situations of violence or abuse in their personal life that may affect their attendance or performance at work. Therefore, each Employer is committed to providing support to staff that experience family violence.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Building and Construction Industry Security of Payment Act 1999 (NSW);

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

Time is Money Join Law Insider Premium to draft better contracts faster.