Design-Builder to Provide Supplemental Information Sample Clauses

Design-Builder to Provide Supplemental Information. Within 30 Days of the occurrence of the event giving rise to the request, unless Owner agrees in writing to allow an additional period of time to ascertain more accurate data, Design- Builder shall supplement the written notice provided in accordance with subparagraph a. above with additional supporting data. Such additional data shall include, at a minimum: the amount of compensation requested, itemized in accordance with the procedure set forth herein; specific facts, circumstances, and analysis that confirms not only that Design-Builder suffered the damages claimed, but that the damages claimed were actually a result of the act, event, or condition complained of and that the Contract Documents provide entitlement to an equitable adjustment to Design-Builder for such act, event, or condition; and documentation sufficiently detailed to permit an informed analysis of the request by Owner. When the request for compensation relates to a delay, or other change in Contract Time, Design-Builder shall demonstrate the impact on the critical path, in accordance with Section 10.5. Failure to provide such additional information and documentation within the time allowed or within the format required shall, to the extent Owner’s interests are prejudiced, constitute a waiver of Design-Builder’s right to an equitable adjustment.
AutoNDA by SimpleDocs
Design-Builder to Provide Supplemental Information. Within 30 Days of the occurrence of the event giving rise to the request, unless Owner/DES agrees in writing to allow an additional period of time to ascertain more accurate data, Design Builder shall supplement the written notice provided in accordance with subparagraph 9.7 B.2 with additional supporting data. Such additional data shall include, at a minimum: the amount of delay claimed, itemized in accordance with the procedure set forth herein; specific facts, circumstances, and analysis that confirms not only that Design Builder suffered the delay claimed, but that the delay claimed was actually a result of the act, event, or condition complained of, and that the Contract Documents provide entitlement to an equitable adjustment in Contract Time for such act, event, or condition; and supporting documentation sufficiently detailed to permit an informed analysis of the request by Owner/DES. Failure to provide such additional information and documentation within the time allowed or within the format required shall, to the extent Owner’s/DES’ interests are prejudiced, constitute a waiver of Design Builder’s right to an equitable adjustment.

Related to Design-Builder to Provide Supplemental Information

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

  • Modified Indemnity Where Agreement Involves Design Professional Services Notwithstanding the forgoing, if the services provided under this Agreement are design professional services, as defined by California Civil Code section 2782.8, as may be amended from time to time, the defense and indemnity obligation under Section 1, above, shall be limited to the extent required by California Civil Code section 2782.8.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

  • CONTRACTOR’S SUBMISSION OF CONTRACT MODIFICATIONS In connection with any Contract modification, OGS reserves the right to:  request additional information  reject Contract modifications  remove Products from Contract modification requests  request additional discounts for new or existing Products

  • PROJECT REPRESENTATION BEYOND BASIC SERVICES 1.2.1. The State may at its option secure the services of a person or persons known as a Clerk-of-the-Works, referred to herein as a "Clerk". The Clerk(s) shall, for all purposes of this Agreement, report and be solely responsible to the State. The State may at any time dismiss the Clerk(s) for cause or convenience; however, any such action shall not affect the State's and ARCHITECT/ENGINEER'S obligations under this Agreement. In such event, the State shall use their best efforts to secure the services of a Clerk or Clerks under this paragraph as soon as is practicable if the State deems it necessary.

  • Drug-Free Workplace Certification As required by Executive Order No. 90-5 dated April 12, 1990, issued by the Governor of Indiana, the Contractor hereby covenants and agrees to make a good faith effort to provide and maintain a drug-free workplace. The Contractor will give written notice to the State within ten (10) days after receiving actual notice that the Contractor, or an employee of the Contractor in the State of Indiana, has been convicted of a criminal drug violation occurring in the workplace. False certification or violation of this certification may result in sanctions including, but not limited to, suspension of contract payments, termination of this Contract and/or debarment of contracting opportunities with the State for up to three (3) years. In addition to the provisions of the above paragraph, if the total amount set forth in this Contract is in excess of $25,000.00, the Contractor certifies and agrees that it will provide a drug-free workplace by:

  • Authorized User’s Statement of Work A competitive Mini-Bid is required for every transaction under this Centralized Contract. An Authorized User must prepare a detailed Statement of Work using Appendix F, Attachment 1, Mini-Bid Template. The Authorized User must distribute the Mini-Bid to all qualified Vendors per Lot(s) (unless a Vendor has removed itself from consideration via the Appendix F, Attachment 5, Mini-Bid Participation Interest Template). Contact information, organized by Lot, will be available on the OGS website for this Contract. An Authorized User shall conduct its Mini-Bid in accordance with the requirements set forth in Appendix F, Attachment 2, How to Use this Contract. The following terms and conditions shall apply to each Mini-Bid issued by an Authorized User:  An Authorized User may require the execution of unique forms, such as Confidentiality Non- Disclosure agreements; and  An Authorized User is required to make tentative award and non-award notifications to each Contractor who submitted a response to the Mini-Bid. Additionally, the minimum time, excluding the date of release, between issuance of the Mini-Bid by the Authorized User to the Mini-Bid Opening is as follows:  Xxx 0 Xxxx-Xxxx: Xxxx (0) Xxxxxxxx Xxxx  Xxx 0 Mini-Bids: Ten (10) Business Days

  • Implementation Specifications 1. The accounting shall contain the date, nature, and purpose of such disclosures, and the name and address of the person or agency to whom the disclosure is made.

  • Schedule for Completing Agreement Closeout Activities Provide All Draft and Final Written Products on a CD-ROM or USB memory stick, organized by the tasks in the Agreement. Products: • Final Meeting Agreement Summary (if applicable) • Schedule for Completing Agreement Closeout Activities • All Draft and Final Written Products