Cross cut test Sample Clauses

Cross cut test. The purpose of this test is to examine whether any abrasive resistant coating of a rigid plastic glazing has sufficient adherence.
AutoNDA by SimpleDocs
Cross cut test. The purpose of this test is to examine whether any abrasive resistant coating of a rigid plastic glazing has sufficient adherence." Paragraph 8.1.4.1., amend the words "safety-glass panes" to read "safety glazing". Paragraphs 8.1.5. and 8.1.6., amend to read: "8.1.5. Burning-behaviour (fire-resistance) test The purpose of this test is to verify that a safety glazing material as defined in paragraphs 2.3., 2.4. and 2.5. above has a sufficiently low burn rate.
Cross cut test. 6.3.1. Indices of difficulty and test method The requirements of annex 3, paragraph 13 shall apply only to coated rigid products. E/ECE/324 Rev.1/Add.42/Rev.1/Amend.1 Regulation No. 43 page 41
Cross cut test. Indices of difficulty and test method The requirements of annex 3, paragraph 13 shall apply only to coated products.
Cross cut test. The cross-cut test is used to determine the adhesion of one or several layers of paint to the substrate. Quick guide: Use a cross-cutter to make six parallel cuts down to the substrate. Next, cross the cuts with six corresponding cuts at a right angle. For this purpose, perform the cuts by holding the handle of the cross-cut tester with one hand without applying additional pressure to the cutter head. The cutting distance must be the same in each direction and, depending on the layer thickness of the coating and type of substrate, as follows: Test as per DIN EN ISO 2409 Test as per ASTM D 3359 - 02 Up to 60µm layer thickness: 1mm cutting interval up to 50µm layer thickness: 1mm cutting interval 60–120µm layer thickness: 2mm cutting spacing 50–125µm: 2mm cutting interval 120–250µm layer thickness: 3mm cutting interval After the cross-cut test is complete, use a soft brush to slightly brush along each diagonal of the grid several times. The evaluation of the test is performed visually, with the naked eye by comparison with table 1. According to the number of chipped-off squares and the appearance, a parameter value – the "cross-cut rating" – is assigned. Table1: Expected value Compliance with the mean value must be ensured.

Related to Cross cut test

  • Drug Test The compulsory production and submission of urine and/or blood, in accordance with departmental procedures, by an employee for chemical analysis to detect prohibited drug usage.

  • WELDING TESTS 31.1 On hire welders must possess the qualifications and class of welding ticket specified by the Employer. It will be at the Employer's discretion whether a welder who does not possess the qualifications and class of welding ticket specified will be hired.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Health Tests At the time of employment, the Employer shall provide a Tuberculin skin test at no cost to the nurse. In the event of a positive reaction to this test, the Employer will provide a chest x-ray at no cost. Upon request, a routine blood examination and urinalysis will be provided at no cost to the nurse once each year.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously. Annex 6 - Appendix 4

  • Right to Observe Testing Developer and Connecting Transmission Owner shall each notify the other Party, and the NYISO, in advance of its performance of tests of its Attachment Facilities. The other Party, and the NYISO, shall each have the right, at its own expense, to observe such testing.

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Drug Test Results 1. All records pertaining to department-required drug tests shall remain confidential, and shall not be provided to other employers or agencies without the written permission of the person whose records are sought. However, medical, administrative, and immediate supervisory personnel may have access to relevant portions of the records as necessary to insure the acceptable performance of the officer's job duties.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.