Concrete Repairs in “Rehabilitation Works Sample Clauses

Concrete Repairs in “Rehabilitation Works. Many factors can lead to defects in old concrete structures which will manifest themselves sooner /or/ later depending on the agressivity of the environment. The visible manifestation of the defects is commonly referred to a damage. − A defect exists where a structure, member, or building material is permanently subjected to stresses or aggressive conditions which exceed its load bearing capacity or resistance. − The damage is the consequence of that defect and normally manifests itself at the surface of the concrete, it may however lie concealed beneath the undisturbed surface of the concrete. The Contractor is invited not to simply repair the damage because this does not by itself suffice to eradicate the defect which caused it. Precautions must therefore be taken by the Contractor to prevent a recurrence of damage caused by the same defect. In most cases this is achieved by treating the surface of the concrete with an additional form of protective treatment: Repair protection: is the formula for successful remedial actions. The Contractor must visit all the site and for each structure: − Identify the various stress factors that can cause damage to concrete structure. − Give guidance in the diagnosis and assessment of such damage. − Suggest “method of treatment” aiming to eradicate the primary cause or defect. The Contractor must obtain full agreement from the Engineer for each of these steps. The Contractor must obtain also previous approval from the Engineer for: − The products. − The remedial treatment of concrete. N.B.: Repairs systems designed to render concrete and reinforced concrete impermeable to water, in existing water retaining structure may be used by the Contractor applying these same procedures. The main zones to be assessed by the diagnosis can be resumed to:
AutoNDA by SimpleDocs

Related to Concrete Repairs in “Rehabilitation Works

  • CONSTRUCTION AND IMPROVEMENTS Concessionaire shall not affix, alter, or erect any permanent or temporary equipment, structures, buildings, or additions to the Concession Premises without first obtaining the prior written approval of Department.

  • Cardiac Rehabilitation This plan covers services provided in a cardiac rehabilitation program up to the benefit limit shown in the Summary of Medical Benefits.

  • REPAIRS AND IMPROVEMENTS 14.1 Prior to registration of transfer, the Purchaser shall not be entitled to effect any alterations to the Property without the prior written consent of the Seller.

  • Maintenance, Alteration and Repair (a) Resident is responsible for and agrees to take good care of the premises, fixtures and all common areas. Resident may not remove any of Owner’s property and will not perform any repairs, upgrades, painting, wallpapering, electric changes or other alterations of the premises without prior written consent from Owner. Resident will be responsible for damage from waste stoppages caused by foreign or improper objects or improper use in lines serving bathrooms, damage to fixtures, appliances, doors, windows, screens, damage from water faucets left on or from doors left open, and repairs or replacements to alarm devices necessitated by misuse or damage by Resident and/or guests. Extraordinary appliances or furnishings such as satellite dishes, hot tubs, pool tables, water beds or high utility-consuming devices may not be installed or placed on the premises or anywhere at the Property without Owner’s prior written consent, in its sole discretion. SAMPLE

  • Demolition work (a) As of 1 October 2020 where Employees are directly performing demolition works that would require a demolition permit that allows the performance of such work, they will receive the amount of $8.35 per hour or the site allowance, whichever is the greater. This allowance will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.

  • ALTERATIONS & IMPROVEMENTS Tenant shall not make any alterations, additions or improvements or do any type of construction to the Property without first obtaining Landlord's written consent. Unless prior written agreement is reached between Tenant and Landlord, any such alterations, additions, improvements or construction shall become part of the Property and shall remain at the expiration of Tenant's Lease term. If Landlord approves of alterations, additions, improvements or construction in writing and Tenant intends to use contractors to undertake such work, the contractors must first be approved in writing by Landlord. Tenant must also place any funds to cover the amount of any alterations, additions, improvements or construction in an escrow account approved by Landlord before the commencement of the work. Landlord shall designate the times and manner of the work being done, exclusively.

  • Rehabilitation The Employer may use the results of the drug and alcohol test to require the employee to successfully complete a rehabilitation plan.

  • Development of the Property Except as modified by this Agreement, the Development and the Property will be developed in accordance with all applicable local, state, and federal regulations, including but not limited to the City’s ordinances and the zoning regulations applicable to the Property, and such amendments to City ordinances and regulations that that may be applied to the Development and the Property under Chapter 245, Texas Local Government Code, and good engineering practices (the “Applicable Regulations”). If there is a conflict between the Applicable Regulations and the Development Standards, the Development Standards shall control.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Rehabilitation Program The company agrees to the implementation of an agreed worker’s compensation rehabilitation policy. The operation of this policy shall be reviewed on a regular basis. The parties commit to ensuring that the rehabilitation of injured workers is an accepted practice, and that suitable duties are provided when available. No employee will be terminated whilst on workers compensation during the first 12 months without prior consultation with the union. The parties agree that the person responsible for the management of rehabilitation cases must be adequately trained to do the job. If such a person is not available within the company, then the services of an agreed building industry rehabilitation coordination service will be used. The parties to this Agreement shall ensure that any employee who sustains a work related injury, illness or disease, will be afforded every assistance in utilising a rehabilitation program aimed at returning that employee to meaningful employment within the industry.

Time is Money Join Law Insider Premium to draft better contracts faster.