Characterization Methodology Sample Clauses

Characterization Methodology. The xpipesLite switch was used as the basic building block to construct the 64-end nodes topologies under test. However, exploring the design space of topologies with such a large number of cores by means of their actual physical synthesis proved impractical due to synthesis time and memory capacity requirements. Therefore, this section presents a way to cut down on the number of physical synthesis tests while still characterizing quality metrics of the full topology with high accuracy. As already reported, the performance bottleneck of a topology lies in its longest switch-to- switch communication channel. Aware of this, for each topology under investigation, a subsystem composed of two communicating switches at the maximum possible distance in the topology is built, thus capturing the largest link delay in that topology. Logic synthesis for maximum performance and place and route are then performed to capture the real minimized switch-to-switch delay. Such delay (which is the critical path delay of the network too) is then used as the target delay to resynthesize, place and route all the possible switch-to-switch system combinations at all the possible link distances in the topology under test. The reason for this is that the goal is to accurately capture the switch cell area at a certain distance and at a certain target speed. It is well known from logic synthesis theory that as the target speed is decreased, a large area can be saved. In this direction, it would make no sense to synthesize switches for maximum performance when a long link limits overall network speed (unless decoupling techniques like link pipelining are used, as we will see later on). With this methodology, only a few selected synthesis runs for each topology need to be per- formed to characterize its delay and area as a whole. The approximation lies in the availability of enough routing channel space for regular routing of NoC links and in the accuracy of wire delays for links that undergo bending in the actual layout. Moreover, with this method it is also possible to capture the link buffering cost, in fact, by leveraging the report of the utilized physical synthesis tool, the inferred buffers along switch-to- switch links can be traced. In order to be as accurate as possible, two communicating ports of both switches in the test subsystem are left unconnected. They are the ports connecting to the network interfaces of processing cores, which are typically placed close to their switc...
AutoNDA by SimpleDocs

Related to Characterization Methodology

  • Calculation methodology No adjustment in the Conversion Price need be made unless the adjustment would require an increase or decrease of at least 1% in the Conversion Price then in effect, provided that any adjustment that would otherwise be required to be made shall be carried forward and taken into account in any subsequent adjustment. Except as stated in this Article VI, the Conversion Rate will not be adjusted for the issuance of Common Stock or any securities convertible into or exchangeable for Common Stock or carrying the right to purchase any of the foregoing. Any adjustments that are made shall be carried forward and taken into account in any subsequent adjustment. All calculations under Article V and Section 6.06 hereof and this Section 6.07 shall be made to the nearest cent or to the nearest 1/10,000th of a share, as the case may be.

  • Methodology 1. The price at which the Assuming Institution sells or disposes of Qualified Financial Contracts will be deemed to be the fair market value of such contracts, if such sale or disposition occurs at prevailing market rates within a predefined timetable as agreed upon by the Assuming Institution and the Receiver.

  • Claims Review Methodology a. C laims Review Population. A description of the Population subject to the Quarterly Claims Review.‌

  • Payment Methodology The Contractor shall be compensated based on the Service Rates in Attachment for units of service authorized by the Institution in a total amount not to exceed the Contract Maximum Liability established in Section C.1. The Contractor’s compensation shall be contingent upon the satisfactory completion of units of service or project milestones identified in Attachment B. The Contractor shall submit invoices, in form and substance acceptable to the Institution with all of the necessary supporting documentation, prior to any payment. Such invoices shall be submitted for completed units of service or project milestones for the amount stipulated.

  • GSA Benchmarked Pricing Additionally, where the NYS Net Price is based upon an approved GSA Supply Schedule:

  • Treatment Program Testing The Employer may request or require an employee to undergo drug and alcohol testing if the employee has been referred by the employer for chemical dependency treatment or evaluation or is participating in a chemical dependency treatment program under an employee benefit plan, in which case the employee may be requested or required to undergo drug or alcohol testing without prior notice during the evaluation or treatment period and for a period of up to two years following completion of any prescribed chemical dependency treatment program.

  • Basis of compilation This statement of eligible expenditure has been prepared to meet the requirements of the grant agreement between [enter Grantee name] and the Commonwealth represented by the Department of Industry, Science, Energy and Resources. Significant accounting policies applied in the compilation of the statement of grant income and expenditure include the following: [enter details] Certification by directors [if not director, replace with appropriate equivalent] [Grantee name] [Project number] For the period [dd/ mm/yyyy] to [dd/ mm/yyyy] We confirm that, to the best of our knowledge and believe, having made such enquiries as we considered necessary for the purpose of appropriately informing ourselves: Statement of grant income and expenditure We have fulfilled our responsibilities for the preparation of the statement of grant income and expenditure in accordance with the cash basis of accounting and the terms of the grant agreement with the Commonwealth, represented by the Department of Industry, Science, Energy and Resources dated [enter date]; in particular, the statement of grant income and expenditure presents fairly in accordance therewith. All events subsequent to the date of the statement of grant income and expenditure which require adjustment or disclosure so as to present fairly the statement of grant income and expenditure, have been adjusted or disclosed. [Where applicable] The effects of uncorrected misstatements are immaterial, both individually and in the aggregate, to the statement of grant income and expenditure as a whole. A list of the uncorrected misstatements is attached to this representation letter. That all Grantee contributions and other financial assistance were spent for the purpose of the project and in accordance with the grant agreement and that the Grantee has complied with the grant agreement and relevant accounting policies. That salaries and allowances paid to persons involved in the project are in accordance with any applicable award or agreement in force under any relevant law on industrial or workplace relations. Signature Name [enter name] Director Date [dd/mm/yyyy] Signature Name [enter name] Director Date [dd/mm/yyyy] For Auditor use only I certify that this statement of grant income and expenditure is the one used to prepare my independent audit report dated [enter date] for the Department of Industry, Science, Energy and Resources. Signature Name [enter name] Position [enter position] Auditor’s employer [enter employer name] Date [dd/mm/yyyy] Attachment B - Independent audit report Background for auditors The purpose of the independent audit report is to provide us with an auditor's opinion on the Grantee’s statement of grant income and expenditure. The statement of grant income and expenditure is prepared by the Grantee to correspond with the expenditure reported to the department by the Grantee for the same period, in the process of claiming grant payments. The independent audit report must be prepared by a person who is an approved auditor. An approved auditor is a person who is: registered as a company auditor under the Corporations Xxx 0000 or an appropriately qualified member of Chartered Accountants Australia and New Zealand, or of CPA Australia or the Institute of Public Accountants; and not a principal, member, shareholder, officer, agent, subcontractor or employee of the Grantee or of a related body corporate or a Connected Entity. The audit should be undertaken and reported in accordance with Australian Auditing Standards. The independent audit report must follow the required format and include any qualification regarding the matters on which the auditor provides an opinion. We may follow up any qualifications with the Grantee or auditor. The independent audit report must be submitted on the auditor's letterhead. Auditors must comply with the professional requirements of Chartered Accountants Australia and New Zealand, CPA Australia and the Institute of Public Accountants in the conduct of their audit. If the auditor forms an opinion that the statement of grant income and expenditure does not give a true and fair view of the eligible expenditure for the period, the independent audit report should be qualified and the error quantified in the qualification section of the independent audit report. The required independent audit report format follows. Auditor’s report Independent audit report in relation to [Grantee name]’s statement of grant income and expenditure to the Commonwealth, represented by the Department of Industry, Science, Energy and Resources (the department). We have audited: the accompanying statement of grant income and expenditure of [Grantee name] for the period [dd/mm/yyyy] to [dd/mm/yyyy], a summary of significant accounting policies and other explanatory information, and management’s attestation statement thereon (together “the financial statement”). The financial statement has been prepared by management using the cash basis of accounting described in note 3.2 to the financial statement; and [Grantee name]'s compliance with the terms of the grant agreement between [Grantee name] and the Commonwealth dated [date of agreement] for the period [dd/mm/yyyy] to [dd/mm/yyyy] (the grant agreement). We have: reviewed [Grantee name]’s statement of labour costs in support of its claim of eligible expenditure[; and performed limited assurance procedures on [Grantee name]’s statement of employee numbers under the grant agreement]. Management’s responsibility Management is responsible for: the preparation and fair presentation of the financial statement in accordance with the basis of accounting described in note 3.2, this includes determining that the cash basis of accounting is an acceptable basis for the preparation of the financial statement in accordance with the grant agreement; compliance with the terms of the grant agreement; the preparation of the statement of employee numbers and labour costs in support of eligible expenditure; and such internal control as management determines is necessary to: enable the preparation of the financial statement and the statement of [employee numbers and ]labour costs that are free from material misstatement, whether due to fraud or error; and enable compliance with the terms of the grant agreement. Auditor’s responsibility Our responsibilities are: To express an opinion, based on our audit, on: the financial statement; and [Grantee name]’s compliance, in all material respects, with the terms of the grant agreement; and To conclude based on: our review procedures, on the statement of labour costs; and our limited assurance procedures on the statement of employee numbers. We conducted our audit of the financial statement in accordance with Australian Auditing Standards; our audit of compliance with the grant agreement in accordance with ASAE 3100, our review of the statement of labour costs in accordance with ASRE 2405[; and our limited assurance procedures on employee numbers in accordance with ASAE 3000]. The applicable Standards require that we comply with relevant ethical requirements and plan and perform our work to: obtain reasonable assurance about whether the financial statement is free from material misstatement and that [Grantee name] has complied, in all material respects, with the terms of the grant agreement; and obtain limited assurance as to whether anything has come to our attention that causes us to believe that the statements of employee numbers and labour costs are materially misstated. An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statement and about the Grantee’s compliance with the grant agreement. The procedures selected depend on the auditor’s judgement, including the assessment of the risks of material misstatement of the financial statement, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the Grantee’s preparation and fair presentation of the financial statement, and to the Grantee’s compliance with the grant agreement, in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Grantee’s internal control. An audit also includes evaluating the appropriateness of accounting policies used by management, as well as evaluating the overall presentation of the financial statement.

  • Balance Computation Method For all dividend-bearing Accounts, dividends are calculated by the average daily balance method which applies a daily periodic rate to the average daily balance for the average daily balance calculation period. The average daily balance is determined by adding the full amount of the principal in Your Account for each day of the period and dividing that figure by the number of days in the period. Accrual on Noncash Deposits. For dividend-bearing Accounts, dividends will begin to accrue on the business day that You deposit noncash items (e.g. checks) into Your Account.

  • METHODS OF CALCULATION 1. Bi-Weekly 158. An employee whose compensation is fixed on a bi-weekly basis shall be paid the bi-weekly salary for his/her position for work performed during the bi-weekly pay period. There shall be no compensation for time not worked unless such time off is authorized time off with pay.

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.

Time is Money Join Law Insider Premium to draft better contracts faster.