Air Conditioning General Requirements Sample Clauses

Air Conditioning General Requirements. This subsection describes the particular technical requirements for air conditioning and ventilation systems of the terminal buildings and should be read in conjunction with the requirements contained in Section 2. This subsection describes the minimum performance specification; it is the Contractor's responsibility to develop this into a full working design which meets the requirements and objectives of the Employer’s Requirements. The following principal areas shall be air conditioned in accordance with criteria indicated below. In addition, during the course of planning, should the Contractor alter the positions of the rooms or enclosures such that habitable rooms result, or those wherein excessive quantities of heat are liberated so as to jeopardise the utilities plant or equipment therein, and where normal ventilation methods are not enough to protect the utilities plant or provide tolerable conditions for the occupants whether sedentary or transient, full refrigerant air conditioning facilities shall be deemed to be included to serve these areas. - Outdoor design condition: The conditions to be derived from Subsection 1.4 shall be considered in the planning and design. - Indoor design condition:
AutoNDA by SimpleDocs

Related to Air Conditioning General Requirements

  • Air Conditioning If the Apartment has been provided with a ledge for split air conditioning system with suitable provision for keeping outdoor units of the AC system and also the route to take refrigerant piping, which the Allottee shall have to strictly follow while installing AC units

  • Heating and Air Conditioning Tenant shall not use any method of heating or air-conditioning, other than that supplied by Landlord, without Landlord’s prior written consent.

  • General Requirements The Contractor hereby agrees:

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • General Requirement Any notice, election, demand, request, consent, approval, or other communication required or permitted to be given under this Contract shall be in writing signed by an officer or duly authorized representative of the party making same and shall be delivered personally or shall be sent by certified or statutory mail, postage prepaid, return receipt requested, shall be effective as of the date on which it is received or would have been received but for the refusal of the addressee to accept delivery, and shall be addressed as shown in the Contract. The persons and addresses to which notices should be given may be changed by notice given in accordance with this Article.

  • Functional Requirements Applications must implement controls that protect against known vulnerabilities and threats, including Open Web Application Security Project (OWASP) Top 10 Risks and denial of service (DDOS) attacks.

  • Special Requirements Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the “Special Requirements” attached hereto as Exhibit “B” and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit “B” and any other provisions of this Agreement, the provisions of Exhibit “B” shall govern.

  • Operational Requirements 4 At-Sea Monitors are deployed, in accordance with coverage rates developed by 5 NMFS and as assigned through the Pre-Trip Notification System (PTNS), to 6 vessels. Due to availability of funding, changes in the fishery management, 7 such as emergency closures, court ordered closures, weather, and unforeseen 8 events must remain flexible. Additional funding for sea days may be added to 9 the contract within the scope and maximum allowable sea days. 10 The following items define the operational services to be provided by the 11 contractor under this contract.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

Time is Money Join Law Insider Premium to draft better contracts faster.