Reliability Acceptance Test definition

Reliability Acceptance Test means operating and monitoring the complete system in a live production mode for a period of 30 consecutive calendar days to verify the system meets the performance and response requirements of the contract while providing the functions and capabilities of the specifications.
Reliability Acceptance Test means operating and monitoring the complete system in a live production mode for a period of ninety (90) consecutive calendar days beginning immediately upon go-live date to verify the system meets the performance and response requirements of the contract while providing the functions and capabilities of the specifications, as specified in Attachment 6 of Contractor’s response to the County’s RFP.

Examples of Reliability Acceptance Test in a sentence

  • Certificate after completion of Erection, Commissioning, Trail run and Reliability &Acceptance Test of the Machine.

  • The final step in commissioning includes a Reliability Acceptance Test.

  • AMOUNT OF LIQUIDATED DAMAGES 1 Successful completion of Global Network Reliability Acceptance Test (Event 11 of Schedule 5) Liquidated Damages for each calendar day or part of a day of Delay in successful completion of the Global Network Reliability Acceptance Test shall amount to £250, subject to a maximum of £25,000.

  • The contractor shall submit Production Reliability Acceptance Test (PRAT) reports for all reliability tests as specified in 3.4.13.3. Sampling of each lot shall be conducted IAW the approved QVMs. The contractor shall be prepared to institute all necessary corrective actions to bring the systems/components into reliability compliance at no additional cost to the Government, to include all units delivered since the last previously successful reliability test as determined by the Government.

  • Once a User Site has passed the Site Reliability Acceptance Test, relevant Charges or AP Charges as appropriate will become due, and Service Rebates will be payable in the event of failure to meet agreed Service Levels, except for User Sites that have passed their Site Reliability Acceptance Test before the end of the one-month migration period.

  • In the 1980s and 1990s a new movement towards regionalism started to flourish with the Canada-USA free trade agreement (FTA).

  • If the cumulative failure of any LRU exceeds 10% of the total LRU population, up to and including the completion of the Reliability Acceptance Test; Project Co shall redesign and replace the defective LRU’s.

  • The Specified Parties indicated that the absence of any of the Contract File Documents noted below, or the inability to agree the indicated information from the Data File to the Contract File Documents or other information for each of the attributes identified, constituted an exception.

  • From the successful passing of the New Reliability Acceptance Test, in accordance with the provisions of Schedule 6 to this Amendment Agreement, the Service shall be supplied by the Contractor to ECMWF, ECMWF Countries and all Acceding Parties in accordance with the New Service Description, the New Service Level Agreement and the New Service Particulars, as contained in Schedules 2, 3 and 4.

  • Under these circumstances, Social Welfare department and DG Child Protection Authority shall submit record of last two years with regard to efforts taken for the destitute children or the recovered children; adopted and thereafter are under the control of any darul aman.

Related to Reliability Acceptance Test

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • technical specification means, with respect to any Software, the document setting forth the technical specifications for such Software and included in the Statement of Work.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Interconnected Reliability Operating Limit or “IROL” shall mean the value (such as MW, MVAR, Amperes, Frequency, or Volts) derived from, or a subset of, the System Operating Limits, which if exceeded, could expose a widespread area of the bulk electrical system to instability, uncontrolled separation(s) or cascading outages.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Service Specification means and include detailed description, statements to technical data, performance characteristics, and standards (Indian as well as) as applicable and as specified in the Contract as well as those specifications relating to Industry standards and codes applicable to the performance of the work, work performance quality and the specifications affecting the works or any additional specification required to be produced by the DCO to meet the design criteria.

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • PJM Region Reliability Requirement means, for purposes of the Base Residual Auction, the Forecast Pool Requirement multiplied by the Preliminary PJM Region Peak Load Forecast, less the sum of all Preliminary Unforced Capacity Obligations of FRR Entities in the PJM Region; and, for purposes of the Incremental Auctions, the Forecast Pool Requirement multiplied by the updated PJM Region Peak Load Forecast, less the sum of all updated Unforced Capacity Obligations of FRR Entities in the PJM Region.

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Service Specifications means the following documents, as applicable to the Services under Your order:

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Utilization review plan or "plan" means a written procedure for performing review.