Production Start Up definition

Production Start Up means the time of initial shipments of a Generic Product Family as requested by the initial Weekly Start Schedule for that Generic Product Family.
Production Start Up means the time of initial shipments of a Generic Product Family after successful qualification testing of Product.
Production Start Up means the time of initial-shipments of a Generic Product Family as requested by the Weekly Start Schedule furnished to Contractor by Company for that Generic Product Family, and after qualification testing for a specific Product or a Product Family has been successful. Products, Quantity and Price Schedule: for each Product or Product Family, a schedule is attached to this Agreement setting forth the name of the Product(s) to be subject hereto, its quantity and its price per unit. Such Schedules may include additional information, such as quantity estimates, special pricing, and specifications. When approved by both parties as provided herein, such Schedule shall become part of, and constitute an amendment to, this Agreement.

Examples of Production Start Up in a sentence

  • Concept Stage : Medium-Low Design Stage : Medium-High Production Start Up Stage : Medium-High Keep on Market Stage : High To answer this question the required NPD Return indications is entered into the model as evidence.

  • There will be not less than one million (1,000,000) Person Hours of NL Project Team activities in the Province before the date of Production Start- Up, including reservoir and drilling engineering, but excluding the GBS FEED and Detailed Engineering commitments set forth in Sections 5.2 and 5.3. The Proponents shall give first consideration to qualified Residents of the Province as they hire new staff, including management, for the NL Project Team office in the Province.

  • Company shall provide training, if necessary, regarding New Products to ensure that processes, procedures and equipment used to build New Products are understood by Contractor, and that New Products Manufactured by Contractor can pass Company’s qualification testing or other evaluation prior to Production Start Up. The decision as to the necessity of the training will be made jointly by Company and Contractor.

  • The move was planned in three phases: Phase I - Qualification; Phase II - Initial Production Start Up; and Phase III - 2000 Full Production Operation.

  • Production Start Up Initial production start up will be coordinated and implemented by Mr. Greenham.

  • Within the district of Phnom Srok area there are three villages that are currently receiving support under the Production Start Up Programme (PSP) that directly assists the very poorest farm families to attain food security.

  • U.S. DEP’T OF JUSTICE, NCJ 173386, AMERICAN INDIANS AND CRIME 3 (1999), https://www.bjs.gov/content/pub/pdf/aic.pdf [https://perma .cc/MBU6-PHGN].

  • Company and Contractor agree to negotiate price, quantities and Production Start Up schedules for New Products, should Contractor agree to Manufacture the New Product.

  • For instance, the various Project stages involved Exploration, Construction, Production Start Up, Production Operations and Maintenance, Drilling organization and Project Group.

  • Company and Contractor agree to negotiate price, volumes and Production Start Up schedules for New Products, should Contractor agree to Manufacture the New Product.


More Definitions of Production Start Up

Production Start Up means the date upon which the cumulative amount of oil transferred at the loading point of the Hebron Project exceeds 3 million (3,000,000) barrels.

Related to Production Start Up

  • Construction Start Date means the later to occur of the date on which Seller delivers to Buyer (a) a copy of the Notice to Proceed that Seller has delivered to the EPC Contractor for the Project, and (b) a written Certification substantially in the form attached hereto as Appendix IV-1.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Benchmark Transition Start Date means, in the case of a Benchmark Transition Event, the earlier of (a) the applicable Benchmark Replacement Date and (b) if such Benchmark Transition Event is a public statement or publication of information of a prospective event, the 90th day prior to the expected date of such event as of such public statement or publication of information (or if the expected date of such prospective event is fewer than 90 days after such statement or publication, the date of such statement or publication).

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Destination state means the state, territory, or foreign country to which motor fuel is directed for

  • Project Start Date means the first Milestone Start Date specified in Schedule B;

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Network Connection Standards means the Distributor’s written technical and safety standards for connection of an Electrical Installation to the Network that are issued by the Distributor and updated from time to time, and include:

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • Drilling operations means the drilling of an oil and gas well and the production and completion operations ensuing from the drilling which require entry upon the surface estate and which were commenced after June 30, 1979, and oil and gas geophysical and seismograph exploration activities commenced after June 30, 1983.

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;

  • Horizontal well means a well bore drilled laterally at an angle of at least eighty (80) degrees to the vertical or with a horizontal projection exceeding one hundred (100) feet measured from the initial point of penetration into the productive formation through the terminus of the lateral in the same common source of supply.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Opium poppy means the plant of the species Papaver somniferum L., except its seeds.

  • Drilling unit means the area fixed for the drilling of one well by order or rule of any state or federal body having authority. If a Drilling Unit is not fixed by any such rule or order, a Drilling Unit shall be the drilling unit as established by the pattern of drilling in the Contract Area unless fixed by express agreement of the Drilling Parties.

  • Project Scope means the description or activity of work to be accomplished on the Project.

  • Development Well means a well drilled inside the established limits of an oil or gas reservoir, or in close proximity to the edge of the reservoir, to the depth of a stratigraphic horizon known to be productive.

  • drilling means the act of boring a hole to reach a proposed bottom hole location through which oil or gas may be produced if encountered in paying quantities, and includes redrilling, sidetracking, deepening, or other means necessary to reach the proposed bottom hole location, testing, logging, plugging, and other operations necessary and incidental to the actual boring of the hole;

  • Phase 2 means the second implementation phase of this section, beginning June 1, 2022 and continuing thereafter.

  • Injection well means a well into which fluids are injected. (See also “underground injection”.)

  • Start-up means the time period required to bring the equipment covered under the Contract from an inactive condition, when construction is essentially complete, to the state ready for trial operation. The startup period shall include preliminary inspection and checkout of equipment and supporting sub-system, initial operation of the complete equipment covered under the Contract to obtain necessary pre-trial operation data, perform calibration and corrective action, shut down, inspection and adjustment prior to the trial operation period.

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Bulk mixing plant means machinery, appliances or other similar devices that are assembled in such a manner so as to be able to mix materials in bulk for the purposes of using the mixed product for construction work;