Designated Processing Facility definition
Examples of Designated Processing Facility in a sentence
Scale receipts from the Designated Processing Facility scale transactions will be collected, maintained by the Contractor according to the Records Retention Policy.
The Contractor remains responsible for the materials until the Designated Disposal Site, Designated Processing Facility, or materials buyers take ownership.
All Diverted self-haul materials will be weighed and recorded prior to leaving the Shoreway Center or weighed-in and recorded (separately from non-self-haul materials) at a state certified scale located at the Designated Processing Facility.
Contractor shall provide or arrange for transportation to a 22 Designated Processing Facility of Organic Materials, C&D materials, and other 23 Recyclable Materials delivered to and recovered at the Transfer Station.
The cost per Ton/Mile is calculated by dividing the total cost by the total tons delivered to the Designated Disposal Site or the Designated Processing Facility, as appropriate, and by the one way mileage to the Designated Disposal Site or Processing Facility, as determined by the Authority.
These Bulky Items will be Collected in non-compaction vehicles and taken to the Designated Processing Facility for sorting.
These Bulky Items may be Collected in non-compaction vehicles, or in compaction vehicles if the materials are not compacted, and taken to the Designated Processing Facility for sorting.
Materials that are transported by Contractor to a Designated Disposal Site or a Designated Processing Facility shall become the property of the owner or operator of the Designated Disposal Site or Designated Processing Facility once the materials have been delivered and unloaded by Contractor, subject to any regulations of the owner/operator related to unacceptable materials.
Contaminated loads report that documents the number of loads, total Tons, and 1398 fees assessed by the operator of the Designated Processing Facilities for receipt 1399 of materials from the Contractor with Contamination levels in excess of allowable 1400 limits for which Contractor’s actions resulted in the Contamination or for receipt of 1401 materials by the Designated Processing Facility from Contractor with Hazardous 1402 Substances.
Contractor shall provide or arrange for transportation to the appropriate Designated Processing Facility of all Plant Materials, Food Scraps, Organic Materials, C&D debris, and other Recyclable Materials delivered to and recovered at the Transfer Station.