Building Defect definition

Building Defect means a defect of a type that is covered by any existing builder’s warranty that applies to the Premises, as notified to the Lessee in writing by the Lessor. “Defects Liability Period” means the period to be notified to the Lessee by the Lessor applicable under the State’s contract with a builder, in relation to the Premises, under which the State may notify the builder of a Building Defect.

Examples of Building Defect in a sentence

  • Building Defect ReportsInsurance AdviceDefect MonitoringInsurance Claim Assessment & NegotiationsDisaster Recovery AdviceInsurance Reinstatement Cost Assessment/ValuationsHistoric Buildings AdviceProject Management/Contract Administration Dealing with insurance claims and recovering loss incurred can be time consuming and add additional pressure to completing a building project within budget and on time.

  • You agree that We cannot accept any liability for Our failure to report a Building Defect that was concealed by the owner of the building being inspected and You agree to indemnify Us for any failure to find such concealed defects.

  • Building Defect Prediction Models in Practice 540 Rudolf Ramler, Software Competence Center Hagenberg, Austria Johannes Himmelbauer, Software Competence Center Hagenberg, Austria Thomas Natschläger, Software Competence Center Hagenberg, AustriaThe information about which modules of a future version of a software system will be defect-prone is a valuable planning aid for quality managers and testers.

  • Porteous, (1992) Improving Maintenance and Reducing Building Defect through ISO 9000, Journal of Quality in Maintenance Engineering, Vol.

  • New York: McGraw Hill.4. Blake Turner & Co Solicitor, (1969) Building Defect: The Legal Position.5. Belgrade Charter, (1975) Conservation in Belgrade, European Commission UNESCO, International Conference Spain.

  • The needs assessment will be provided to all schools that notify the Department of their intent to apply by March 8th.

  • As a result, it is critical to hire experienced consultants to undertake Building Defect Assessment in order to determine the main causes and potential solutions to building defect problem.Building defect assessment: Building audit & structural inspection.

  • Most larger listed companies are already signed up to report using TCFD standards or, indeed, producing TCFD-aligned reports.

  • A.G., Hongfang, L.: Building Defect Prediction Models in Practice.

  • Azhar bin Yusof (2017272712), Correlation between Integrated Database and Cost Building Defect Operation during Defect Liability Period.

Related to Building Defect

  • Construction defect means a deficiency in or a deficiency arising out of the design, specifications, surveying, planning, supervision, or observation of construction or construction of residential improvements that results from any of the following:

  • Building Drain means that part of the lowest horizontal piping of a drainage system which receives the discharge from soil, waste, and other drainage pipes inside the walls of the building and conveys it to the building sewer, beginning five (5) feet (1.5 meters) outside the inner face of the building wall.

  • Major Defect means a condition that exists on a ground ambulance vehicle that requires the Department or the certificate holder to place the ground ambulance vehicle out-of-service.

  • Latent Defect means a defect, inherently lying within the material or arising out of design deficiency, which do not manifest themselves and/or was not reasonably discoverable during Defect Liability period.

  • Major Servicing Defect With respect to each Payment Date and any Reference Obligation for which Freddie Mac has determined the existence of an Unconfirmed Servicing Defect, the occurrence of any of the following: (a) the related servicer repurchased such Reference Obligation or made Freddie Mac whole resulting in a full recovery of losses incurred (“Make- Whole”) during the related Reporting Period; or (b) the party responsible for the representations and warranties and/or servicing obligations or liabilities with respect to the Reference Obligation becomes subject to a bankruptcy, an insolvency proceeding or a receivership. Reference Obligations covered under servicing settlements will not result in Major Servicing Defects.

  • Minor defect means a defect which is not a Major Defect.

  • Environmental Defect means, with respect to any given Asset, a material violation of Environmental Laws in effect as of the Effective Time in the jurisdiction in which such Asset is located.

  • Building Common Areas means with respect to the Tower, the areas, facilities and amenities specified in Schedule [E] which are to be used and enjoyed in common with all the other Apartment Acquirers of the Units in the Building; and

  • Base Building Work means the base building work for the Building as described in this Manual.

  • Underwriting Defect With respect to any Payment Date and any Reference Obligation for which Xxxxxxx Mac has determined the existence of an Unconfirmed Underwriting Defect, the occurrence of any of the following: (i) such Reference Obligation is repurchased by the related seller or servicer during the related Reporting Period, (ii) in lieu of repurchase, an alternative remedy (such as indemnification) is mutually agreed upon by both Xxxxxxx Mac and the related seller or servicer during the related Reporting Period, (iii) Xxxxxxx Mac in its sole discretion elects to waive the enforcement of a remedy against the seller or servicer in respect of such Unconfirmed Underwriting Defect during the related Reporting Period or (iv) the party responsible for the representations and warranties and/or servicing obligations or liabilities with respect to the Reference Obligation becomes subject to a bankruptcy, an insolvency proceeding or a receivership.

  • Base Building shall include the structural portions of the Building, the public restrooms and the Building mechanical, electrical and plumbing systems and equipment located in the internal core of the Building on the floor or floors on which the Premises are located. Tenant shall promptly provide Landlord with copies of any notices it receives regarding an alleged violation of Law. Tenant shall comply with the rules and regulations of the Building attached as Exhibit E and such other reasonable rules and regulations adopted by Landlord from time to time, including rules and regulations for the performance of Alterations (defined in Section 9).

  • Building Work has the meaning given to it in section 6 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth);

  • Minor Servicing Defect With respect to each Payment Date and any Reference Obligation for which Freddie Mac has determined the existence of an Unconfirmed Servicing Defect, the occurrence of a remedy, other than by repurchase or Make-Whole that is mutually agreed upon by both Freddie Mac and the related servicer that results in a recovery of the damages sustained by Freddie Mac on such Reference Obligation as a result of the Unconfirmed Servicing Defect.

  • Latent Defects means such defects caused by faulty designs, material or work-man- ship which cannot be detected during inspection, testing etc, based on the technology available for carrying out such tests.

  • Parking Lot means a building or land used for the parking or storage of ten or more motorcars or bakkies, or two or more buses or trucks, excluding −

  • Landlord Delay shall occur if either: (i) Landlord fails to complete the Base Building and/or other improvements on the Project that are required by the DDA, the Parking REA and/or the CC&Rs, and as a direct result of such failure Tenant is unable to obtain a temporary or permanent certificate of occupancy for the Premises upon substantial completion of the Tenant Improvements; or (ii) substantial completion of the Warm Shell Improvements or Tenant Improvements is delayed directly and solely as a result of any of the following and such delay could not have been mitigated by Tenant using commercially reasonable measures, which delay occurs after the Delivery Date and before the Commencement Date and does not result from Tenant's interference or delay in connection with completion of the Tenant Improvements or after a Tenant Default or Work Letter Draw Event: (a) subject to Paragraph 8 above, unreasonable interference by Landlord or Landlord's Contractor with the construction of the Warm Shell Improvements or the Tenant Improvements; (b) Landlord's failure to comply with any deadlines for response to, or submissions from, Tenant as required by this Work Letter; (c) any material Discretionary Changes to Landlord's Plans or the Warm Shell Plans after their final approval by applicable governmental entities (other than Tenant Modifications) that directly affect Tenant's Plans or the Tenant Improvements; and/or (d) Landlord failure to complete portions of the Base Building and/or other improvements on the Project that are Landlord's obligation to complete hereunder, and as a direct result of such failure Tenant and Tenant's contractors do not have access to the Premises to the extent required to complete the Warm Shell Improvements and/or Tenant Improvements. Tenant shall give Landlord at least five (5) days prior notice if Tenant becomes aware that Landlord is in danger of causing a Landlord Delay, and if Landlord takes appropriate measures to prevent such delay within such five (5) day period, no adjustment to the Commencement Date shall be made on account of such Landlord; provided, however, that if such delay was not reasonably foreseeable by Tenant, the five (5) day period for prior notice and opportunity to mitigate provided above shall be changed to forty-eight (48) hours after Tenant becomes aware of such delay or potential delay.

  • Improvement warranty means an applicant's unconditional warranty that the

  • Tenant Improvements Defined in Exhibit B, if any.

  • Title Defect means with respect to a Lease any lien, encumbrance, adverse claim, default, expiration, failure, defect in or objection to real property title, other than Permitted Encumbrances, that alone or in combination with other defects renders Sellers’ title to the Lease less than Defensible Title.

  • Defective Work means (a) Work that is unsatisfactory, deficient or damaged, does not conform to the Contract Documents, or does not meet the requirements of any inspection, test or approval, or (b) Work associated with punch list items that the Contractor fails to complete within a reasonable time after issuance of the punch list by the Project Manager.

  • Building Square Footage or "BSF" means the square footage of assessable internal living space of a Unit, exclusive of any carports, walkways, garages, overhangs, patios, enclosed patios, detached accessory structure, other structures not used as living space, or any other square footage excluded under Government Code Section 65995 as determined by reference to the Building Permit for such Unit.

  • Substitute Improvements means the substitute or additional improvements of the Issuer described in Article V hereof.

  • Landlord Work means the work, if any, that Landlord is obligated to perform in the Premises pursuant to a separate agreement (the “Work Letter”), if any, attached to this Lease as Exhibit C.

  • Nonconformance as used in this clause means a condition of any hardware, software, material, or service/workmanship in which one or more characteristics do not conform to requirements.

  • Accumulated Funding Deficiency has the meaning ascribed to that term in Section 302 of ERISA.

  • Home improvement means the remodeling, altering,